My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/06/2022
CBCC
>
Meetings
>
2020's
>
2022
>
12/06/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2023 11:37:48 AM
Creation date
2/14/2023 11:11:15 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
12/06/2022
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
289
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IRC Central WWTFSludge Tank Odor Control <br />Exhibit A. Scope of Work <br />Task <br />Review Meeting <br />Final Preliminary Design Report <br />90% Design <br />Review Meeting <br />Final Design — Bid Documents <br />Bidding Support Services <br />Quality Control <br />Duration from NTP <br />14 weeks <br />17 weeks <br />26 weeks <br />28 weeks <br />32 weeks <br />TBD <br />ATKI NS <br />Consultant will be responsible for the professional quality of all deliverables. This shall include <br />an internal Quality Assurance Plan that, as a minimum, provides review of all deliverables and <br />significant calculations by another qualified professional that was not responsible for preparing <br />the deliverable or calculation. <br />Assumptions <br />The following assumptions have been made in the development of this scope of work, <br />schedule, and fee: <br />General <br />• The record drawings, "as-builts," calculations, and information on any upgrades for the <br />sludge holding tank and I&C system are available and will be furnished to consultant. <br />• The design will be based on the federal, state, and local codes and standards in effect at <br />the start of the project. Any changes in these codes may necessitate a change in scope. <br />• The drawings will follow Atkins CAD standards. Atkins master specifications will be used <br />as the basis for Division 1 and all technical specifications. <br />• County Staff will provide Division 0 and associated front end documents. <br />• Electronic seal and signatures are acceptable. <br />• Attendees of the review meetings are designated as decision makers. <br />• Data requests will be addressed within five (5) calendar days. <br />• Facilities or areas to be surveyed are readily accessible. <br />• FDEP permitting is not required for this project. No permitting support or fees are <br />included in this scope. <br />Existing Conditions/ Scope of Work <br />• The existing electrical feed to the facility will be sufficient for any increase in power <br />required for the new odor control equipment. This will be verified during preliminary <br />engineering to allow adequate time for external coordination, if required. <br />• Landscaping will not be included in this project. <br />5 <br />lM~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.