Laserfiche WebLink
IRC Central WWTFSludge Tank Odor Control <br />Exhibit A. Scope of Work <br />Task <br />Review Meeting <br />Final Preliminary Design Report <br />90% Design <br />Review Meeting <br />Final Design — Bid Documents <br />Bidding Support Services <br />Quality Control <br />Duration from NTP <br />14 weeks <br />17 weeks <br />26 weeks <br />28 weeks <br />32 weeks <br />TBD <br />ATKI NS <br />Consultant will be responsible for the professional quality of all deliverables. This shall include <br />an internal Quality Assurance Plan that, as a minimum, provides review of all deliverables and <br />significant calculations by another qualified professional that was not responsible for preparing <br />the deliverable or calculation. <br />Assumptions <br />The following assumptions have been made in the development of this scope of work, <br />schedule, and fee: <br />General <br />• The record drawings, "as-builts," calculations, and information on any upgrades for the <br />sludge holding tank and I&C system are available and will be furnished to consultant. <br />• The design will be based on the federal, state, and local codes and standards in effect at <br />the start of the project. Any changes in these codes may necessitate a change in scope. <br />• The drawings will follow Atkins CAD standards. Atkins master specifications will be used <br />as the basis for Division 1 and all technical specifications. <br />• County Staff will provide Division 0 and associated front end documents. <br />• Electronic seal and signatures are acceptable. <br />• Attendees of the review meetings are designated as decision makers. <br />• Data requests will be addressed within five (5) calendar days. <br />• Facilities or areas to be surveyed are readily accessible. <br />• FDEP permitting is not required for this project. No permitting support or fees are <br />included in this scope. <br />Existing Conditions/ Scope of Work <br />• The existing electrical feed to the facility will be sufficient for any increase in power <br />required for the new odor control equipment. This will be verified during preliminary <br />engineering to allow adequate time for external coordination, if required. <br />• Landscaping will not be included in this project. <br />5 <br />lM~ <br />