Laserfiche WebLink
IRC Central WWTF Sludge Tank Odor Control <br />Exhibit A. Scope of Work <br />ATKINS <br />• Existing concrete pads, driveways, stairways, and housekeeping pads will remain as is <br />and are sufficient for use in supporting the odor control system. New housekeeping <br />pads for the Odor Control system will be provided. <br />• The location of subsurface improvements such as underground utilities are not included <br />in this proposal. <br />Technical <br />• An overall hydraulic profile will not be included in the drawings. <br />• No site civil work beyond odorous air pipe routing will be required as part of this <br />project. <br />• No SCADA updates are required beyond 1/0 re-routing associated with odor control. <br />• The existing survey controls points are located on-site or no farther than a quarter mile <br />away from the facilities. <br />Exclusions <br />The following items are excluded from this scope of work: <br />• Destructive inspection. <br />• Material testing or sampling. <br />• Inspections of enclosed areas. <br />Compensation <br />Consultant proposes to perform the work described in Tasks 1— 5 on a Fixed Fee basis with <br />budgets between the sub -tasks and expenses being interchangeable as needed. The estimated <br />total engineering fee including labor and expenses associated with the scope of work is not to <br />exceed $129,149 as summarized in the table below and presented in detail in Exhibits B and D. <br />Task No. <br />Task <br />Fee <br />1 <br />Project Management <br />$18,282 <br />2 <br />Survey <br />$14,688 <br />3 <br />Preliminary Design Report <br />$32,590 <br />4 <br />Final Design <br />$55,025 <br />5 <br />Bidding Support Services <br />$7,134 <br />Expenses <br />$1,430 <br />Total Fee <br />$129,149 <br />0 <br />17 <br />