My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/06/2022
CBCC
>
Meetings
>
2020's
>
2022
>
12/06/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2023 11:37:48 AM
Creation date
2/14/2023 11:11:15 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
12/06/2022
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
289
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IRC Central WWTF Sludge Tank Odor Control <br />Exhibit A. Scope of Work <br />ATKINS <br />• Existing concrete pads, driveways, stairways, and housekeeping pads will remain as is <br />and are sufficient for use in supporting the odor control system. New housekeeping <br />pads for the Odor Control system will be provided. <br />• The location of subsurface improvements such as underground utilities are not included <br />in this proposal. <br />Technical <br />• An overall hydraulic profile will not be included in the drawings. <br />• No site civil work beyond odorous air pipe routing will be required as part of this <br />project. <br />• No SCADA updates are required beyond 1/0 re-routing associated with odor control. <br />• The existing survey controls points are located on-site or no farther than a quarter mile <br />away from the facilities. <br />Exclusions <br />The following items are excluded from this scope of work: <br />• Destructive inspection. <br />• Material testing or sampling. <br />• Inspections of enclosed areas. <br />Compensation <br />Consultant proposes to perform the work described in Tasks 1— 5 on a Fixed Fee basis with <br />budgets between the sub -tasks and expenses being interchangeable as needed. The estimated <br />total engineering fee including labor and expenses associated with the scope of work is not to <br />exceed $129,149 as summarized in the table below and presented in detail in Exhibits B and D. <br />Task No. <br />Task <br />Fee <br />1 <br />Project Management <br />$18,282 <br />2 <br />Survey <br />$14,688 <br />3 <br />Preliminary Design Report <br />$32,590 <br />4 <br />Final Design <br />$55,025 <br />5 <br />Bidding Support Services <br />$7,134 <br />Expenses <br />$1,430 <br />Total Fee <br />$129,149 <br />0 <br />17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.