My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/06/2022
CBCC
>
Meetings
>
2020's
>
2022
>
12/06/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2023 11:37:48 AM
Creation date
2/14/2023 11:11:15 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
12/06/2022
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
289
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�G`N E ER�ti <br />May 13'', 2021 BWLET <br />Ms. Yvonne Picard, PE Otis U <br />ATKINS North America, Inc. <br />482 South Keller Road <br />Orlando, FL 32810-6101 <br />Re: Indian River Central WWTF Sludge Tank Odor Control Facility <br />Vero Beach, Florida <br />Dear Ms. Picard: <br />We are pleased to submit our proposal for electrical and instrumentation engineering services for <br />the above project. The following serves to provide an overview of the engineering services <br />Bailey Engineering Consultants, Inc. (BEC) intends to furnish on the above referenced project to <br />Atkins. Your signature on this agreement will serve as your letter of intent. Our services shall <br />include completed drawings for the work, specifications, opinion of probable construction cost <br />estimate covering all phases of our design in accordance with a format determined by you. Our <br />work scope shall include the following: <br />Task 01— Proiect Management & Proeress Meetings <br />1. BEC shall attend the kick-off meeting for the project to discuss the detailed project <br />approach, the project schedule, and the budget. <br />Task 02 — Survey <br />1. By Others. <br />Task 03 — Preliminary Design Report <br />1. Data Collection, Review, and Conceptual Design <br />a. Conduct site visit as required to identify site -conditions for the associated electrical <br />and instrumentation improvements. <br />b. Evaluate options for the proposed improvements. <br />c. Attend one (1) meeting with CITY to present and review the findings and results of <br />the preliminary engineering. <br />2. Deliverables: <br />a. Draft Preliminary Design Report. BEC shall submit electronic copies in PDF. <br />Additional reproduction by others. <br />10620 GRITTIX ROAVD, SUITE 202 • COOPER CITT, SEL • 33328 <br />4'9fO9V*E: 954-448-7930 • PAX. 954-713-99.59 <br />25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.