Laserfiche WebLink
Ms. Yvonne Picard, PE Page 2 May 13'', 2021 <br />b. Final Preliminary Design Report. BEC shall submit electronic copies in PDF. <br />Additional reproduction by others. <br />Task 04 — Final Design <br />1. Design of electrical system and I&C as required for Odor Control facility. <br />2. Design of the interface with existing WWTF electrical and I&C system. <br />3. Miscellaneous Odor Control building electrical and I&C design. <br />4. Review and coordination of the Odor Control specifications. <br />5. Attend one (1) meeting as requested to review status and design requirements. <br />6. Deliverables: <br />a. 90% Submittal. BEC shall submit electronic copies of the plans (in AutoCAD <br />format and PDF), specifications (in MS Word and PDF) and cost opinion (in <br />PDF) to Atkins. Additional reproduction by others. <br />b. 100% Submittal. BEC shall submit electronic copies of the plans (in AutoCAD <br />format and PDF), specifications (in MS Word and PDF) and cost opinion (in <br />PDF) to Atkins. Additional reproduction by others. <br />Task 05 — Bidding Support Services <br />1. Pre -Bid meeting by others. <br />2. BEC will review the bid submittals and make a recommendation as related to electrical <br />and I&C. <br />