My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3/5/1996
CBCC
>
Meetings
>
1990's
>
1996
>
3/5/1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:05:48 PM
Creation date
6/16/2015 3:20:46 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
03/05/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOOK �1 ;'fur 455 <br />3,000 feet long Prefabricated Erosion Prevention Reef located along a portion of <br />the Vero Beach Atlantic Ocean shoreline. The contract scope of work included <br />three tasks. Task 1, Project Design, and Task 2, Permitting, are substantially <br />complete. The Florida DEP has issued a Wetland Resource Permit and a Coastal <br />Construction Permit has been drafted for issuance pending the resolution of the <br />120 Administration Hearing Process. The Attorney representing the County on <br />the 120 Hearing will give a report on the final DEP permit during the March 5, <br />1996 BCC meeting. The US Army Corps of Engineers permit is scheduled for <br />issuance in late March, or early April, 1996. The Erosion Control Line has been <br />established and a Submerged Lands easement has been issued. <br />Task 3 of the Agreement with American Coastal, Project Construction and <br />Installation, states that "Upon Receipt of all the permits and a Notice to Proceed <br />from the County (the "Notice to Proceed"), which Notice to Proceed will not be <br />unreasonably withheld, Contractor shall complete fabrication, construction, and <br />installation of the Project...". <br />It is expected that all permits will be issued by April 15, 1996. At this time, the <br />County can waive the contract language requiring all permits to be received and <br />allow issuance of a "Notice to Proceed" for Task 3, which would allow the <br />Contractor to begin fabricating the PEP units so that they can be ready for <br />installation by July 2, 1996. Since mobilization and fabrication will take 16 <br />weeks, the Contractor must begin immediately to allow for placement of the units <br />in July, 1996. <br />ALTERNATIVES AND ANALYSIS <br />Staff is currently negotiating contracts for the following PEP Reef Services: <br />USACOE Monitoring Plan - CERC - $ 972,000 <br />Environmental/Sea Turtle Monitoring - <br />FIT and Dr. Fletemeyer $ 72,000 <br />Morgan and Ecklund Surveyors - <br />Cost included in CERC amount above $ — <br />$1,044,000 <br />The PEP Reef Contractor has indicated that the original project cost of $1.762,500 <br />Is still applicable. <br />If the "Notice to Proceed" is issued, immediate payment to American Coastal <br />Engineering in the amount of $200,925 is due. <br />Other reasons to issue a "Notice to Proceed" at this time are as follows: <br />1) -To provide for commencement of a pre -installation survey which must be <br />approved by DEP prior to duly 1, 1996. <br />2) Schedule a pre -construction meeting required by DEP. <br />3) Conduct pre -condition turtle survey. <br />4) Install pre -installation tide gauges. <br />5) Allow Contractor time to secure insurance and bonds for the project. <br />31 <br />March 5, 1996 <br />
The URL can be used to link to this page
Your browser does not support the video tag.