My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-040
CBCC
>
Official Documents
>
2020's
>
2023
>
2023-040
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2023 12:25:39 PM
Creation date
2/27/2023 12:21:30 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
02/21/2023
Control Number
2023-040
Agenda Item Number
8.G.
Entity Name
Coastal Waterways Design & Engineering LLC
Subject
Work Order 4 Dune Crossing Replacement of two Structures and
Dune Ramp Repair at the Tracking Station Beach Access
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WORK ORDER 4 <br />Dune Crossover Replacement for Two Structures and Dune Ramp Repair <br />at the Tracking Station Beach Access <br />This Work Order Number 4 is entered into as of this 21 day of February <br />2023, pursuant to that certain Continuing Architectural Services Agreement for Professional <br />Services entered into as of the 17th day of April, 2018, renewed and amended as of May 18, 2021 <br />(collectively referred to as the "Agreement"), by and between INDIAN RIVER COUNTY, a political <br />subdivision of the State of Florida ("COUNTY") and Coastal Waterways Design & Engineering LLC <br />("CONSULTANT"). <br />The COUNTY has selected the CONSULTANT to perform the professional services set forth <br />on Exhibit A (Scope of Work), attached to this Work Order and made part hereof by this <br />reference. The professional services will be performed by the CONSULTANT for the fee schedule <br />set forth in Exhibit B (Fee Schedule), attached to this Work Order and made a part hereof by this <br />reference. The CONSULTANT will perform the professional services within the timeframe more <br />particularly set forth in Exhibit C (Time Schedule), attached to this Work Order and made a part <br />hereof by this reference all in accordance with the terms and provisions set forth in the <br />Agreement. Pursuant to paragraph 1.4 of the Agreement, nothing contained in any Work Order <br />shall conflict with the terms of the Agreement and the terms of the Agreement shall be deemed <br />to be incorporated in each individual Work Order as if fully set forth herein. <br />IN WITNESS WHEREOF, the parties hereto have executed this Work Order as of the date <br />first written above. <br />CONSULTANT: <br />COASTAL WATERWAYS DESIGN <br />& ENGINEERING LLC <br />By: <br />Steph n W. Boehning, P.E., <br />Qey- <br />Title: President <br />BOARD OF COUNTY COMMISSIONERS <br />of INDIAN RIVER COUNTY``,', COAtM <br />" <br />��. <br />. •. <br />By: <br />Joe Earman, Chai <br />BCC Approved Date: Februa <br />�IT�fI •�`2'Q�'i'' � +1 <br />21 2023 <br />'�••F Coir <br />Attest: Jeffrey R. Smith, Clerk of Court <br />and Comptroller <br />By:_Wa11AQb <br />Deduty Clerk <br />— /I f <br />Approved: <br />Mic a Z' o, Interim County Administrator <br />Approved as to form and legal sufficiency: <br />Dyla . Reingold, County Attorney <br />Page 1 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.