My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-040
CBCC
>
Official Documents
>
2020's
>
2023
>
2023-040
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2023 12:25:39 PM
Creation date
2/27/2023 12:21:30 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
02/21/2023
Control Number
2023-040
Agenda Item Number
8.G.
Entity Name
Coastal Waterways Design & Engineering LLC
Subject
Work Order 4 Dune Crossing Replacement of two Structures and
Dune Ramp Repair at the Tracking Station Beach Access
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Order No. 4 <br />Dune Crossover Replacement for Two Structures and Dune <br />Ramp Repair at the Tracking Station Beach Access <br />additional surveys/studies/analysis, CONSULTANT will submit a separate proposal requesting the <br />COUNTY's authorization for these additional services. <br />Task 4 - Construction Administration Services <br />CONSULTANT will assist the COUNTY with answers to potential bidders' questions and assist the <br />COUNTY with issuance of one (1) addendum if necessary. CONSULTANT will assist the COUNTY <br />Representative in bidding and negotiating a construction agreement. <br />CONSULTANT will assist the County with providing Building Permit processing assistance to the <br />County selected Contractor. This assistance is limited to CONSULTANT providing a response to <br />Building Code Official comments that are specifically related to the CONSULTANT design <br />documents submitted for Building Department review. Specifically, the work by CONSULTANT <br />will include the Building Department's engineered drawing requirements. Work by CONSULTANT <br />will not include preparation and submittal of a Building Permit Application. <br />CONSULTANT will conduct an on-site pre -construction meeting with the COUNTY Representative <br />and the selected contractor. CONSULTANT will review shop drawings and up to two (2) change <br />orders if necessary. CONSULTANT will make up to five (5) daily site observation, additional daily <br />site observations will be negotiated at our hourly rates if deemed necessary. Daily site <br />observations shall include identifying that the Contractor is performing the scope of work in <br />accordance with the plans, specifications and permits. In addition, CONSULTANT will make a final <br />site observation and submit a certification to the regulatory agencies to identify conformance of <br />the project to the specifications, plans and permit. <br />The COUNTY will provide all permit application fees, publishing fees, and additional surveys and <br />testing reports required by the FDEP and any associated agencies. Additional surveys, studies or <br />analyses may be required by the agencies. These surveys, studies, or analyses are beyond the <br />scope of this work but may be provided by CONSULTANT under separate authorization. <br />(THE REMAINDER OF THIS PAGE IS INTENTIONALLY BLANK) <br />Page 5 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.