Work Order
Approved Date
02/21/2023
Control Number
2023-043
Agenda Item Number
8.L.
Entity Name
Aptim Environmental and Infrastructure, Inc.
Subject
Work Order No. 20180006-14 Phase 2, for Sector 3 Beach and Dune Restoration Project
Post Construction Biological Mentoring System
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A^ I January 31, 2023 <br />�J Page 3 of 6 <br />operations will be submitted to the County and FDEP within 45 days and the monitoring report will be <br />submitted within 90 days of completion of the survey. <br />Task 1A: Cost <br />The lump sum cost for this task is $109,990.97. <br />1B. Year 3 Post -Construction Sea Turtle Monitoring <br />The Sector 3 2023 sea turtle monitoring will be managed and coordinated by APTIM, and conducted by <br />APTIM's approved subconsultant, Ecological Associates, Inc. (EAI). EAI will join APTIM and CPE to meet with <br />the County on a weekly basis to provide a status report of the monitoring. <br />Task 16: Scope of Work <br />APTIM will oversee the scope of work proposed by EAI and provide the necessary administrative coordination <br />to the County. The 2023 sea turtle monitoring effort along the approximate 3.7 mile shoreline (R-20 to R-40) <br />within the Sector 3 Phase 1 Project Area addresses permit -required post -construction sea turtle monitoring. <br />The monitoring will comply with all applicable conditions set forth in the regulatory permits and related <br />authorizations for the project. EAI has provided the enclosed proposal and cost breakdown for sea turtle <br />monitoring tasks, which are summarized as follows: <br />1. Mobilization <br />2. Project Management <br />3. Daily Sea Turtle Monitoring and Data Management <br />4. Nest Marking and Monitoring <br />5. Weekly Escarpment Surveys and Reporting <br />6. Reporting <br />Task 113: Deliverable <br />EAI will submit a nesting season summary report within 90 days of completion of all monitoring activities. <br />Additionally, an Excel spreadsheet summarizing all nesting activity and reproductive success will be prepared <br />and submitted electronically to JCP Compliance and FWC. <br />Task 16: Schedule <br />The sea turtle monitoring will commence in March 2023. <br />Task 16: Cost <br />The lump sum cost for this task is $119,536.04. <br />2. Task 2: Phase 2 — Post -Construction Environmental Monitoring <br />2A. Year 1 Post -Construction Nearshore Hardbottom Biological Monitoring <br />The nearshore hardbottom monitoring for this task shall include: <br />• Hardbottom edge mapping (R-40 to R-57) <br />• Monitoring permanent transects (R-40 to R-56) <br />
The URL can be used to link to this page
Your browser does not support the video tag.