My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-043
CBCC
>
Official Documents
>
2020's
>
2023
>
2023-043
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2023 2:00:01 PM
Creation date
2/27/2023 1:59:22 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
02/21/2023
Control Number
2023-043
Agenda Item Number
8.L.
Entity Name
Aptim Environmental and Infrastructure, Inc.
Subject
Work Order No. 20180006-14 Phase 2, for Sector 3 Beach and Dune Restoration Project
Post Construction Biological Mentoring System
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AAPTIM <br />Task 2A: Scope of Work <br />3) Hardbottom Edge Mapping: <br />January 31, 2023 <br />Page 4 of 6 <br />APTIM shall map the position of the nearshore hardbottom edge for the Sector 3 Phase 2 project area, <br />from R-40 to R-57, including 2000 feet south (downdrift) of the project area, for a length of approximately <br />3.2 miles. The same methods described above in Task 1A will be conducted. <br />4) Monitoring Permanent Transects: <br />Phase 2 monitoring will be conducted from R-40 to R-56 and will include sixteen (16) permanent transects <br />(9 biological and 7 sediment -only). The same methods described above in Task 1A will be conducted. <br />It is anticipated that the effort to delineate the hardbottom edge and monitor the transects will take up <br />to eight (8) field days based on previous monitoring events. The data will be compiled and incorporated <br />into a GIS database and in situ data will be entered into an Access database. Time to complete data entry, <br />reduction, analyses, and report production is included in the cost estimate to address the data <br />management and reporting requirements for those 8 days of field operations. <br />Task 2A: Deliverable <br />Deliverables will be prepared as described above in Task 1A and will be submitted concurrently with Task 2A <br />deliverables. <br />Task 2A: Schedule <br />The Year 1 Post -Construction monitoring event will take place during summer 2023 concurrently with the Year <br />2 Post -Construction monitoring event. Raw data from field operations will be submitted to the County and <br />FDEP within 45 days and the monitoring report will be submitted within 90 days of completion of the survey. <br />Task 2A: Cost <br />The lump sum cost for this task is $70,278.55. <br />2B. Year 2 Post -Construction Sea Turtle Monitoring <br />The Sector 3 2023 sea turtle monitoring will be managed and coordinated by APTIM, and conducted by <br />APTIM's approved subconsultant, Ecological Associates, Inc. (EAI). <br />Task 26: Scope of Work <br />APTIM will oversee the scope of work proposed by EAI and provide the necessary administrative coordination <br />to the County. The 2023 sea turtle monitoring effort along the approximate 2.95 mile shoreline (R-40 to R-55) <br />within the Sector 3 Phase 2 Project Area addresses permit -required post -construction sea turtle monitoring. <br />The monitoring will comply with all applicable conditions set forth in the regulatory permits and related <br />authorizations for the project. EAI has provided the enclosed proposal and cost breakdown for sea turtle <br />monitoring tasks, which are summarized as follows: <br />1. Mobilization <br />2. Project Management <br />3. Daily Sea Turtle Monitoring and Data Management <br />
The URL can be used to link to this page
Your browser does not support the video tag.