My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-044
CBCC
>
Official Documents
>
2020's
>
2023
>
2023-044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2023 2:08:10 PM
Creation date
2/27/2023 2:06:25 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
02/21/2023
Control Number
2023-044
Agenda Item Number
8.M.
Entity Name
Edlund, Dritenbas, Binkley Architects and Associates, P.A.
Subject
Amendment No.1 for Architectural Services to Work Order No. 5 for Fire Station 7
Project Number
IRC-1911
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
h. Observe and record all storm water drainage structures (pipe culvert inverts, catch basins, <br />spillways, etc.), including inverts of associated pipes: <br />i. Observe and record all above ground visual sanitary sewer systems (gravity flow or force <br />mains); <br />j. Observe and record all wood lines, tree lines and trees 4 inches and larger within the limits of <br />survey: <br />k. Observe and record vertical ground spot elevations within project corridor at major grade breaks <br />and changes in existing contour; <br />Utility Investigation and Location by others (WGI): <br />$ 4,000.00 <br />Coordinate with WGI to perform four (4) test holes of the existing Florida Gas Transmission 20" and <br />26" high pressure transmission gas lines of the proposed crossing at 22nd Street right of way. CAI to <br />field observe (horizontal and vertical) four (4) existing FGT gas transmission lines potholes (soft digs) <br />as identified on the provided sketch from MBV Engineering; add all of the above to topographic <br />survey. <br />EXHIBIT "A" <br />CARTER ASSOCIATES, INC. <br />TYPICAL GENERAL CONDITIONS AND PROVISIONS <br />1. All fees quoted in this agreement are applicable for one (1) year from date of proposal. At that time, fees will be <br />reviewed with the client and adjusted as necessary. <br />J: SURNTY WORK AUTHOR17AT10\S 21-4w S EDB Architect; IRC Fire Station =- AS 2 Rex 120h22.docx <br />OF h <br />
The URL can be used to link to this page
Your browser does not support the video tag.