My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-045
CBCC
>
Official Documents
>
2020's
>
2023
>
2023-045
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2023 2:33:23 PM
Creation date
2/27/2023 2:31:46 PM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Laura Yonkers, PE, CFM <br />February 14, 2023 <br />Page 6 <br />TASK 3 — CONSTRUCTION ASSISTANCE <br />The CONSULTANT will provide the following services during the construction phase of the <br />project: <br />• Provide and certify as -built drawings based on a signed -and -sealed survey of the <br />completed project. <br />COUNTY Responsibility: <br />■ The COUNTY will provide necessary support for the Contractor to have access to the site <br />and facilities to complete construction through County acceptance of the project. <br />■ The COUNTY will conduct weekly, or more frequent, construction inspections. <br />■ The COUNTY will conduct shop drawing reviews. <br />■ The COUNTY will provide engineering and design clarifications to Contractor Requests for <br />Information (RFIs). <br />Deliverables: <br />■ One electronic copy (.dwf), two signed -and -sealed full-size and four half-size copies of <br />the As -built Drawings developed from Contractor -provided as -built survey. <br />Key Assumptions: <br />■ The COUNTY will provide inspection services. <br />■ Construction will be completed within 3 months of the Contractor's receipt of the <br />COUNTY's Notice to Proceed. <br />SCHEDULE <br />The proposed project milestone schedule is provided in the table below. <br />Task Duration Weeks from <br />(weeks) Notice to Proceed <br />Task 1 - Project Management, Meetings and Communications ALL ALL <br />Task 2 - Design - Basis of Design TM 4 4 <br />Task 2 - Design - 75% <br />8 10 <br />Task 2 - Design - Final 6 16 <br />Task 3 - Construction Assistance (As-builts) 2 TBD <br />Note: The proposed scheduled is based on 2 -week review periods by the COUNTY of project deliverables. <br />
The URL can be used to link to this page
Your browser does not support the video tag.