My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-045
CBCC
>
Official Documents
>
2020's
>
2023
>
2023-045
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2023 2:33:23 PM
Creation date
2/27/2023 2:31:46 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
02/21/2023
Control Number
2023-045
Agenda Item Number
8.N.
Entity Name
Jones Edmunds & Associates, Inc.
Subject
Work Order 3 for conceptual redesign of a Stormwater Treatment Facility’s Headworks
at Egret Marsh Headworks Repair
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Laura Yonkers, PE, CFM <br />February 14, 2023 <br />Page 5 <br />Deliverables: <br />■ One electronic copy (.dwf) of 75% Design Drawings. <br />■ Technical Specifications Table of Contents. <br />■ 75% Review Meeting Summary (optional). <br />Key Assumptions: <br />■ This project will not require any permitting or geotechnical engineering. <br />■ Repairs recommended to the slab will not require a structural engineer. <br />■ The COUNTY will require a 2 -week minimum review time of the submittal. <br />FINAL DESIGN SUBMITTAL <br />The Final Design Submittal Package will be submitted to the COUNTY and will include the <br />following: <br />■ Final Design Documents: Updated Drawings and Specifications from the 75% Submittal <br />and incorporation of any COUNTY comments. <br />■ Updated Engineer's Opinion of Probable Construction Cost. <br />COUNTY Responsibility: <br />■ Review and provide feedback and confirm Final Design is bid -ready. <br />■ Possible meeting with the CONSULTANT to review the Final Design Submittal. <br />Deliverables: <br />■ One electronic copy (.dwf), two signed -and -sealed full-size, and four half-size copies of <br />the Final Design Drawings, and two signed -and -sealed copies of the Technical <br />Specifications. <br />■ One electronic copy (.pdf) of the updated Engineer's Opinion of Probable Construction <br />Cost. <br />Key Assumptions: <br />■ Final Design will be submitted following the COUNTY's approval of revisions. <br />■ Addressing comments will take approximately 2 weeks. <br />
The URL can be used to link to this page
Your browser does not support the video tag.