Laserfiche WebLink
Laura Yonkers, PE, CFM <br />February 14, 2023 <br />Page 5 <br />Deliverables: <br />■ One electronic copy (.dwf) of 75% Design Drawings. <br />■ Technical Specifications Table of Contents. <br />■ 75% Review Meeting Summary (optional). <br />Key Assumptions: <br />■ This project will not require any permitting or geotechnical engineering. <br />■ Repairs recommended to the slab will not require a structural engineer. <br />■ The COUNTY will require a 2 -week minimum review time of the submittal. <br />FINAL DESIGN SUBMITTAL <br />The Final Design Submittal Package will be submitted to the COUNTY and will include the <br />following: <br />■ Final Design Documents: Updated Drawings and Specifications from the 75% Submittal <br />and incorporation of any COUNTY comments. <br />■ Updated Engineer's Opinion of Probable Construction Cost. <br />COUNTY Responsibility: <br />■ Review and provide feedback and confirm Final Design is bid -ready. <br />■ Possible meeting with the CONSULTANT to review the Final Design Submittal. <br />Deliverables: <br />■ One electronic copy (.dwf), two signed -and -sealed full-size, and four half-size copies of <br />the Final Design Drawings, and two signed -and -sealed copies of the Technical <br />Specifications. <br />■ One electronic copy (.pdf) of the updated Engineer's Opinion of Probable Construction <br />Cost. <br />Key Assumptions: <br />■ Final Design will be submitted following the COUNTY's approval of revisions. <br />■ Addressing comments will take approximately 2 weeks. <br />