Laserfiche WebLink
BOOK 97 wF 5 J6 <br />- Wastewater <br />Based upon the most intense use allowed under the proposed <br />amendment, development of the property will have a wastewater <br />generation rate of approximately 147 Equivalent Residential Units <br />(ERU), or 36,750 gallons/day. This is based upon the level of <br />service standard of 250 gallons/ERU/day. County wastewater lines <br />extend to the site from the West Regional Wastewater Treatment <br />Plant, which currently has a remaining capacity of more than <br />800,000 gallons/day and can accommodate the additional wastewater <br />generated by the proposed amendment. <br />- Solid Waste - <br />Solid waste service includes pick-up by private operators and <br />disposal at the county landfill. The county's adopted level of <br />service standard for landfill capacity is 2.37 cubic yards/person/ <br />year. With the county's average of approximately 2.3 persons/unit, <br />a 147 unit residential development would be anticipated to house <br />approximately 338 people (2.3 X 147). For the subject request to <br />meet the county's adopted level of service standard of 2.37 cubic <br />yards/person/year, the landfill must have enough capacity to <br />accommodate approximately 801 (338 X 2.37) cubic yards/year. <br />A review of the solid waste capacity for the active segment of the <br />county landfill indicates the availability of more than 895,000 <br />cubic yards. The active segment of the landfill has a 2 year <br />capacity, and the landfill has expansion capacity beyond 2010. <br />Based on the analysis, staff determined that the county landfill <br />can accommodate the additional solid waste generated by the site <br />under the proposed zoning district.- <br />.- Drainage <br />All developments are reviewed for compliance with county stormwater <br />regulations which require on-site retention, preservation of <br />floodplain storage and minimum finished floor elevations. In <br />addition, development proposals must meet the discharge <br />requirements of the county Stormwater Management Ordinance. Since <br />the site is located within the M-1 Drainage Basin and the Indian <br />River Farms Water Control District (IRFWCD), development on the <br />property will be prohibited from discharging any runoff in excess <br />of two inches in a twenty-four hour period, which is the approved <br />IRFWCD discharge rate. <br />In this case, the minimum floor elevation level of service <br />standards do not apply, since the property does not lie within a <br />floodplain. However, both the on-site retention and discharge <br />standards apply. With the most intense use of this site under the <br />proposed amendment, the maximum area of impervious surface would be <br />approximately 240,451 square feet, or 5.52 acres. The maximum <br />runoff volume, based on that amount of impervious surface and the <br />25 year/24 hour design storm, and given the IRFWCD two inch <br />discharge requirement, would be approximately 569,736 cubic feet. <br />In order to maintain the county's adopted level of service, the <br />applicant would be required to retain approximately 436,152 cubic <br />feet of runoff on-site. With the soil characteristics of the <br />subject property, it is estimated that the pre -development runoff <br />rate is 96.05 cubic feet/second. <br />Based upon staff's analysis, the drainage level of service standard <br />would be met by limiting off-site discharge to the IRFWCD's maximum <br />discharge rate of two inches in twenty-four hours, and requiring <br />retention of the 436,152 cubic feet of runoff for the most intense <br />use of the property. <br />56 <br />March 19, 1996 <br />� � r <br />