My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/17/2023 (3)
CBCC
>
Meetings
>
2020's
>
2023
>
01/17/2023 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2023 11:20:19 AM
Creation date
3/9/2023 10:39:43 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
01/17/2023
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
401
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDER NO. PSC -2022 -0433 -TRF -El <br />DOCKET NO. 20220165 -El <br />PAGE 43 <br />FLORIDAPOWER& LICUTCOMPANY <br />(Coritinuedfrorn Sheetblo, 8,681) <br />PROVtS,l0NS FOR FNEROY USE DURINQ (.'ON'rPOL PERIODS: <br />Attachment A <br />Page 38 of 64 <br />SixWertthRevised Meet No. 8.682 <br />Cancels Fifteenth Re0sedSheet IXo.8.682 <br />Customers notified at' a load control evoi tshout dnot exceed their Firm Demand duringperiodswiten the Company is controlling <br />load. However; electricity will be made available during contra) panods if the Customeem, failure to meet its Vital Demand is a <br />res ultafone ofthe followingcondifions: <br />t. Force Majeare everils(see Deffilitions)hwhidi can bedenonstrated to thevalisfaction oftheCompany, or <br />2, maintenance of generation equipment necessary for the implementation efload control which is performed at a pre- <br />arranged time and date mutually agreeable tothe Compaliyand theCuirtomer(Sev, or <br />3, addingfirm load thatwus notpreviously non-firm loadto theCustonives racilityor <br />4, an eventaff"fingtocal, shale or national security, or <br />3. an event whose triallre Mlinres that space launch activititi be placed in the critical made (requiring, a eloseil-loop <br />the NASA Test Dir—for at Kemwdyqptice <br />Centerand,lor the USAF Range Safety Officer at Calle Canaveral Air Force Station. <br />The Customers enerpytise (in excess ofthe Firm Demand) for the conditions listed above will be billed lut"whal to The <br />CA)TI11111W) no longarrivailable, <br />the Customer will the billed, in addition to (be pornial chaMosprovided hereunder, the greater ofthe Company's. As -Available <br />Euvl�*vst, or the most expaitsive encipy (calctflated oil a cent per kilowatt-hour basis) that FPL is purchasing Or selling <br />during that period, leas the applicable clussfuel chArge,As-Available Energy cost is the cost calculated for Schedule MWA <br />if the Company detemunes that the Chotomer lids utilized one or more ofthe exeeptions, above in artexcessive manner the <br />Company will term mate servicounder this ridet as, described inTEPUNI OFSERV ICE. <br />Ifttle Custom er excee& the Firm [)am and during a period when the Company is con rollingtoad for unyremstvother tlian those <br />op"ified above, then the Customtrwil) be: <br />1, billed I " 0 01IAeJlcl LWoreXce.s kW lorThe, prior sixty (60) To ourbs or die it ambero fm ontlis the Chlatomer )has been <br />billed <br />billed Apotatty charge of$ 1.28 per kwofoxcei* M for each month orrebilling <br />Yxovils kW for tobilling and penalty charges is doWthirrudby taking the difrorenco between the Cuslomeesku'll agate during the <br />load coatrolpLtioddividad by fife numtetorhourpirt the load controt period anti die Cam lou='s 'Firm Deralmd".The Customer <br />will notbe rellidled or poslizediwice for the sameoxvvw IW in the calculation described above. <br />(Continued on Sheallo, 8,683) <br />Issued bv.-Tiffan.vCoben,FxecutiveDirector,Rsttcl'kvelopiiient& Wutegy <br />xfrt,,,w�x <br />-�,,,56i <br />
The URL can be used to link to this page
Your browser does not support the video tag.