My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/17/2023 (3)
CBCC
>
Meetings
>
2020's
>
2023
>
01/17/2023 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2023 11:20:19 AM
Creation date
3/9/2023 10:39:43 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
01/17/2023
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
401
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDER NO. PSC -2022 -0433 -TRF -EI <br />DOCKET NO. 20220165 -EI <br />PAGE 44 <br />Attachment A <br />Page 39 of 64 <br />T-welfthReAsed Sheet \a. 8.694 <br />YL4JHWAF0WhK& LIGHT EX)NIVAIN Y :n [reels Flt' etrUt Rev iced ghee% Via, iS.CtitF{ <br />(Continued from ',kbcdNo, 8.681) <br />Inthe event the ("Wklm or pays tile Charges for Early Tormininuoubilcauseno rcplao€iucnt Customei(Ois (are) avoilabless specified in <br />paragraph d. Above, hilt the lweht ( I 2)moliftfrom the date ofiermination <br />"r '"V100 audit this Rider or Fell, lat at determines that there is no need for the MW reduction in accordance with the FPL Numeric <br />(,*,,TnmtrciaviliduAfial(,*oitsvrvahm OMP, then the Customer will be refumilail all or piorkofthe rebilling and penalty in proportion to <br />the amount of'NI W obtained to replace the lost capacity less the additional cost incurred by the Company to serve thisc.MW during any <br />load coutrolperlodu <br />Cliams for ERrIv'rcuminatioir <br />lutho'evolitthat <br />a) service is terminated by the Company foraily reason(s) specified in this tectiort, or <br />b) there is a termimstionefthe Customs existing service mrd, within lwVIVv(I2)months orguch tvituillatioltorvervicV. the <br />Company receives A request to re-establish service of similar character undera firm service or a <br />or under this rider with a stilt from nett -firm lead to turn service, <br />0 at a diflerentlocationin die Company's service area, it <br />ii) under a different narn e Or different owncribillor <br />iii) underothereirQuinsmiam whogeeMctwouldbe to increasefirm demand oil die <br />five (S)yearVadvanoewrinen oon"'l <br />C) the (Alstom" transfOrs, th 0 conurollahleporticei Of the Customers load m Dorm Min and" or to a firm or a curmiLible service rate <br />schedule withoutprovidino at least five (5) years' advancewritten notice, <br />then the Cuslomer will tie: <br />1, rebilled 58,63 per kW of Utility Controlled Demand for die shorter of (a) the most recent prior sixty (W) months <br />during which the Customer was billed for service tinder this Hider, or (b) the UUMbIf Of MODOW the ('1100110 her <br />been trilled trader this Rider, and <br />2. billed a penalty chargeofS1,28 porkWofUtifity Controlled Demand tirrev the number ofmoutho retrilled in No, I above. <br />SPUAAL PROVISIONS: <br />1., 0 ontrol ofthe (7`ii.t.mer'v loud whall b., accomplished through the Company'$ loud Management systems by use of control <br />circurits connected directly to the Cuslornerit switching equipment or the Clixtorneek load may be controlled by use of all <br />energy man agwiteutsystem where the firm demand level can be established or modified only by moms *fjointacccov by the <br />Customer and die Company. <br />2, The Customtr v-hidl grant the Company reasonable access rot rustallaTI& mailltaulirlq. inspecting, testing =&or removing <br />Company- ownedlowl Control equipment <br />3. It shall be die responsibility ofthe Customer to determine thlit all electrical equipment to be controlled is in good repair and <br />working eondifi,'m, The Company will not be responsible for the repair, maintenance or replacement of the Customer's <br />Vloctrical equipment. <br />4, The Company is net req uired to install lead control equipment ifthe installation cannot beeconomicallyjustified, <br />5. Credithe under this Rider will commence 0wr the instaligtion, inspection and successful testragol'the load control equipment <br />6. Maiuttleriance Of equipment (including generators) neevogary for the implementation of load contrcl will not be scheduled <br />durnigperiods where the Company projects that it would not be able to withstand the loss ofils largest unit and continue <br />to serve firm oemice cueromers, <br />i (',nurni rd On SheA No. 8,685) <br />Issuett hy: TiffitriyCohen, Executive Dircaorllrite IkveIopvaenWStratc& <br />I", f fe C UA r. <br />-1 "CPD <br />
The URL can be used to link to this page
Your browser does not support the video tag.