ORDER NO. PSC -2022 -0433 -TRF -El
<br />DOCKET NO. 20220165 -El
<br />PAGE 45
<br />FIA)HIDAPOWER&
<br />(Continuedfront, SheellNo, 8115)
<br />Attachment A
<br />Page 40 of 64
<br />Forty-
<br />. %cmWRc%*dShcct.No.8.716
<br />71rese costs A all be paid by the Nsloract prior to the initiation of any construction uoti, by FPL ThiaCusloractsball also pay any
<br />ridditiouak:,-Iwith dosiganjodificalion s mques led Act thcoriin a] vftimatc ha4 bcourn ado,
<br />REMOVAL OF Fm-TuTfm
<br />trStrect Lighting facilities are MMOVAXI by either Cuslom a request or letrainaliou or breach of the pay
<br />FPL un araoantvqualto0te ungtrratintstaliwi wstefOre rernovedfacilitieslcss anysul-,W-v due and any dcpwiawn(bMWonc.%I
<br />depreciation rates As approved1by the FloritlePublic Service Commimion)plus removal cost,.
<br />MONTHLY RATE,
<br />Lummairc
<br />MAI Pressure
<br />Sodium Vapor
<br />Mercury vapor
<br />Lamp sr/v Initial
<br />Lulneng iwalt#
<br />6,300 70
<br />9.500 100
<br />16,000 150
<br />22,4000 200
<br />50,000 400
<br />27,500 250
<br />140,000 1,000
<br />6,000 140
<br />175
<br />250
<br />21,500 400
<br />MhMo,
<br />Estimate, fixtures
<br />55.30
<br />$4,92
<br />ss -07
<br />$7,69
<br />$7,77
<br />68.18
<br />$12,30
<br />$312
<br />$3.99
<br />S6A
<br />$6,45
<br />Charge for FPL-fawned
<br />Owned UnIt
<br />UnIt
<br />(S)
<br />Fib"Flass PPIV agedon ly for the strall lighting system
<br />Maintv-
<br />Energy,RIUMV
<br />58.14
<br />50.99
<br />tion -Duel
<br />"rte
<br />11,8840per foot
<br />$0,99
<br />$8.45
<br />$2,17
<br />$1,40
<br />$8,49
<br />$120
<br />$2.04
<br />$9.31
<br />$2,91
<br />S3,00
<br />$13,50
<br />$2,80
<br />SS 13
<br />$16,30
<br />P10
<br />SK96
<br />$15,19
<br />$$,48
<br />$14,02
<br />531,80
<br />51,93
<br />52,11
<br />$7,86
<br />SIM
<br />$2,63
<br />$9.45
<br />52,79
<br />53,54
<br />SITSI
<br />$2.75
<br />$5.46
<br />$14,66
<br />'rhe troa-fuel crerVehargris 3A We per k*'h,
<br />Bills tend eved bwad on -rout!"chorp, unbandiaigo rchragas is not peluritlej-
<br />Now racilifielt are cl000dto this rateoffedive January 1, 2017.
<br />Charges for other FPL -owned fwilitice:
<br />Charge for r. ustonser-
<br />Owned UnIt
<br />Cbrwrotv Me usod only forlhe Atreet lighting system
<br />58.14
<br />Fib"Flass PPIV agedon ly for the strall lighting system
<br />$5.61
<br />Steelpoleusedonlyforlhestreetlighlittgsystem
<br />58.14
<br />50.99
<br />4,865e per root
<br />(Jultergoaundoonductors under paving
<br />11,8840per foot
<br />Charge for r. ustonser-
<br />Owned UnIt
<br />(S) ....
<br />Relaosping/
<br />Energy
<br />Forrav
<br />91LIX
<br />53,16
<br />50.99
<br />$3-57
<br />$1,40
<br />$4,23
<br />$2,04
<br />S5,80
<br />$1,00
<br />$8,54
<br />$5,71
<br />VM
<br />53,06
<br />$19,50
<br />S14,02
<br />54,05
<br />52.11
<br />$4,36 52.63
<br />$6,86 $3,54
<br />".1:€5.83 55.46
<br />'11re Underground conductor under paving, charyc call uA apply where a CLAD is paid pursuant It, sacfiou 'a)" under 'Cuiltorno
<br />Cuntnbutious.71isLlndcagrcaaidvaadta ornotuuderpavinguhawwillapplyintheaysituations. I
<br />SPECIAL. PRO VI STON�
<br />WheTetheCont party provide; facifiticsodicr than those liatod abovelbenrouthty charges, as appimbic iballbe computed as fi>lows,
<br />Facififies Ounrp: 1 28% o fthe Company's average installed cost of the pole, light fixture, or balk.
<br />FPLchn11assthemain narxeuhxtg in this tlaifffOr fixtures that riallunderthospecialplov4iontlased
<br />ern waluge, 1f special provision fixture falls Wtlwetu two Wgragtl, the Maintenance Charge Will t1C
<br />averaged between two existing watt pa
<br />(CoahzuedonSheat No,
<br />sued by. TiffanylColien, Executive Director, Rate Devc1optutnM Strategy
<br />E rrecthv:
<br />1, LPI
<br />
|