My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/13/2022 (2)
CBCC
>
Meetings
>
2020's
>
2022
>
12/13/2022 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2023 12:17:21 PM
Creation date
3/16/2023 10:48:56 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
12/13/2022
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
469
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Comprehensive Plan Capital Improvements Element <br />concurrency management system must apply to all development activity in the County. The system <br />must then identify the applicable standards for each facility, the geographic scope of each facility, and <br />the method of monitoring facility capacity changes. Most importantly, this system must specify when <br />facilities are considered available. <br />Project Applicability <br />All development orders issued by the County and identified below must comply with the concurrency <br />management plan and meet level -of -service standards. Development orders are County approvals for <br />construction and/or land development activity. Specifically, development orders consist of the <br />following: comprehensive plan amendments, rezonings, site plan approvals, preliminary plat <br />approvals, development of regional impact (DRI) approvals, planned development preliminary <br />approvals, and building permit approvals for multi—family projects. <br />Within Indian River County, the impact from the construction of a single family home on an existing <br />subdivision platted lot or legally created single-family parcel will constitute a de minimus impact on <br />public facilities and thus be exempt from the concurrency requirement. Concurrency traffic impacts <br />for single-family homes will be accounted for through tracking single-family trips and an annual <br />traffic count update of the County's Concurrency Management System. Single — family trips tracked <br />through this accounting system will be considered in development project traffic studies. <br />Service Standards <br />Level -of -service standards for concurrency related facilities are established in this plan for the <br />following facilities: sanitary sewer, potable water, solid waste, stormwater management, recreation, <br />public schools, and transportation. Those are explained in detail in the applicable comprehensive plan <br />elements. <br />For each facility, level -of -service is a measure of the relationship between demand for the service and <br />the capacity of the facility. Capacity, however, is measured differently for each type of facility. Table <br />6.16 identifies both the capacity and demand measures for each public facility. Those measures are <br />addressed in detail, and existing capacities are identified in the applicable Comprehensive Plan <br />Elements. <br />Table 6.16: Service Level Measures for Concurrency Related Facilities <br />Public Facility Category <br />Specific Facility <br />Capacity Measure <br />Demand Measure <br />Geographic Scope <br />Transportation <br />Roadway <br />Volume of cars <br />accommodated over time <br />Peak Season/Peak <br />Direction/Peak Hour Trips <br />Affected Roadways <br />Community Development Department Indian River County <br />Adopted December _, 2022, Ordinance 2022- 40 <br />259 <br />
The URL can be used to link to this page
Your browser does not support the video tag.