My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/31/2023
CBCC
>
Meetings
>
2020's
>
2023
>
01/31/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2023 1:11:51 PM
Creation date
3/16/2023 1:01:11 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
01/31/2023
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
386
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 2 <br />CHANGE ORDER BACK-UP DOCUMENTATION <br />FIN No.: 436379-1-54-01 & 436379-1-54-02 Contract No: IRC -1505 <br />Change Order No.: 03 Amount $ 814,277.14 and 0 Days <br />Title of Issue <br />Construction of 531d Street Signalized Intersection at 66th Avenue in accordance with Simmons & <br />White (Engineer -of -Record) plans Signed & Sealed dated September 28, 2022. <br />I. Entitlement Analysis <br />The purpose of this Change Order is to provide means to compensate the Contractor to construct a <br />new signalized intersection on 66th Avenue at 53rd Street. This scope of work was not included at <br />time of original bid. <br />II. Time Analysis <br />The Contractor is not pursuing a time extension to complete this additional work. <br />III. Engineer's Estimate <br />a. Basis of Estimate <br />The Engineer's Estimate was based on current State -Wide -Average (SWA) multiplied by the <br />Engineer -of -Records' plan quantities for this new scope of work. Considering the increase in <br />unit cost is appropriate as the decision to proceed with this extra work occurred at this time <br />and the Contractor was unable to proceed with procurement of the necessary components <br />earlier. To this we added Mobilization & Maintenance of Traffic (MOT) as a percentage based <br />on original contract. This resulted in an Engineer's Estimate totaling $827,689.97. <br />b. Estimate <br />The Engineer's Estimate to add a signalized intersection at 53rd Street resulted in the net <br />increase to Contract in the amount of $827,689.97. This price includes all mark-ups and no <br />bonding. <br />Refer to Appendix "A" for a breakdown of the Engineer's Estimate and backup documentation. <br />c. Contractor's Quote <br />The Contractor's quote submitted a Change Order in the amount of Eight Hundred Fourteen <br />Thousand Two Hundred Seventy -Seven and Fourteen Cents ($814,277.14). <br />Refer to Appendix "B" for a breakdown of the Contractor's cost proposal. <br />d. Final Disposition <br />After comparing the Engineer's Estimate of $827,689.97 to the Contractor's price of <br />$814,277.14 the Contractor's proposal is less than the Engineer's Estimate by $13,412.83. <br />After review of the Contractor's proposal the County has agreed to the Contractors price of <br />$814,277.14 has been accepted. <br />IV. CRS Coding <br />503 Change resulting from engineering decision (use specific reason in lieu of this when possible) <br />256 <br />