Laserfiche WebLink
BOOK 97 PAGE 799 <br />SOUTH COUNTY WASTEWATER TREATMENT PLANT - <br />AGREEMIENT WITH _CAMP, DRESSER AND WKEE, INC. - <br />AMENDMENT NO. 2 <br />The Board reviewed a Memorandum of April 3, 1996: <br />DATE: APRIL 3, 1996 <br />TO: JAMES E. CHANDLER <br />COUNTY ADMINISTRATOR <br />FROM: TERRANCE G. P <br />DIRECTOR OF UT ERVICES <br />PREPARED ROBERT O. WISEMEN, P.E <br />AND STAFFED BY: ENVIRONMENTAL ENGINEER <br />SUBJECT: SOUTH COUNTY WASTEWATER TREATMENT PLANT <br />AGREEMENT WITH CAMP, DRESSER AND MCKEE, INC. <br />AMENDMENT NO. X A <br />INDIAN RIVER COUNTY PROJECT NO. IIS -90 -20 -DC <br />BACKGROUND <br />On September 20, 1994, the Board of County Commissioners approved <br />Amendment No. 1, of the agreement with Camp, Dresser and McKee, <br />Inc., in the amount of $489,000.00, to design, permit, bid, provide <br />professional services and resident inspection during construction <br />for the expansion of the aforementioned wastewater treatment plant <br />and fast tract construction of a filter to the existing plant. <br />(See agenda item). <br />ANALYSIS <br />The original agreement between Indian River County and Camp Dresser <br />and McKee, Inc., included permitting and site planning services for <br />the expansion to 2.0 MGD. However, because the filters were to be <br />constructed before the plant expansion to 2.0 MGD, the Florida <br />Department of Environmental Protection (FDEP), the Army Corps of <br />Engineers (ALOE) and the Indian River County Planning and Zoning <br />Department required a separate set of permits for the filter <br />addition. Furthermore, in March 1995, FDEP enacted a new dredge <br />and fill regulation and the Environmental Protection Agency (EPA) <br />delegated NPDES permitting authority to FDEP. The Environmental <br />Resources Permit (ERP) was created by FDEP to cover the new dredge <br />and fill regulatory changes* and the introduction of the ERP. <br />Permit applications have become longer and more information is <br />required from the permittee before the permit can be issued. <br />Because a separate set of permits was required for the filter <br />addition, the number of permits` required was doubled. The original <br />budget to obtain the permits for the expansion to 2.0 MGD was <br />exhausted by the permitting effort that was required for the <br />filters. <br />72 <br />April 9, 1996 <br />s � � <br />