My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1983-108
CBCC
>
Resolutions
>
1980'S
>
1983
>
1983-108
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2023 12:00:06 PM
Creation date
3/30/2023 11:59:38 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
1983-108
Approved Date
11/02/1983
Subject
Bayside Utilities Wastewater System Franchise
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(or the sum of five hundred dollars ($500) , whichever is greater) , <br />derived franrronthly service charges to defray the cost of regulation <br />and for use of County rights-of-way and public places. The Utility <br />shall pay the 6% franchise fee quarterly. Said fee shall be shown as a <br />separate additional charge on utility bills. <br />The Utility shall supply the County with a copy of the Utility's <br />annual report and financial statenents. All records and all accounting <br />of Utility shall be in accordance with the Uniform System of Accounts of <br />the National Association of Regulatory Utilities Corrrnissioners and <br />general accepted accounting principles. Within ninety (90) days after <br />close of fiscal year, the Utility shall sutmit financial staterrents <br />prepared by a CPA and in accordance wit11 general accepting accounting <br />standards and NARUC. Upon demand by the Board the Utility will sutmit <br />audited financial staterrents certified by a CPA. Also, a letter fran a <br />CPA certifying that the six percent (6 %) franchise fee and the two and <br />one-half percent (2 ½%) renewal and replaceirent account has been <br />collected and disbursed in accordance with the terms of this Agreerrent. <br />SECI'ION XVI <br />Esera.., Charges <br />The Utility agrees to pay a fee in the arrount of the currently <br />inposed contribution in aid of construction for each unit in effect at <br />tlle tirre of the issuance of a certificate of occupancy, as a <br />contribution in aid of construction charge (for future connection to <br />County water or wastewater collection systems ) as provided for in <br />Ordinance 80 -21, Section 3, Part B. Utility further agrees to pay a sum <br />per ERC wastewater plant capacity charge , as each unit is canpleted as <br />the future plant capacity charges as provided for in Ordinance 80-22, <br />Section 1 or according to the Ordinances in effect at the tirre of tlle <br />issuance of a certificate of occupancy. <br />The County will establish separate interest bearing passbook for <br />the wastewater system and will deposit all escrow charges paid for any <br />and all connections in this franchise. The fees referenced in this <br />section are sub j ect to the escalation provisions of Section XIV <br />contained herein, using the County factor established in Ordinance 80-21 <br />and 80-22. The fees referenced in this Section shall always be <br />reasonable. <br />Throughout the term of this franchise, the Utility shall be <br />entitled to any and all interest which shall be paid annually on or <br />before September 30th of each year to the Utility. The Utility shall be <br />entitled to an accounting of said interest bearing account at any tirre <br />upon request irade by it to the County. <br />(A) Should the County at any tirre within the ensuing seven (7) <br />years provide a wastewater collection system and furnish wastewater <br />services to individual custarers within the franchise territory, the <br />sums of rroney remaining in said account consisting of plant capacity <br />10
The URL can be used to link to this page
Your browser does not support the video tag.