Laserfiche WebLink
The rates to be charged can reflect a reasonable rate of return on <br />a rate base that is inclusive of these items. The rate of return shall <br />not exceed twelve percent (12%) of the rate base. <br />•rhe Utility shall at any tirre, when requested by a cons\.lll'er, make a <br />test of the accuracy of any neter; prior, however, to any test being <br />made by the Utility, the sum of ten dollars ($10.00) shall be deposited <br />with the Utility by the party requesting such test. Such sum shall be <br />returned if the test shows the neter to be inaccurate in its delivery. <br />If the neter is inaccurate, the neter will be repaired or changed , and <br />should the neter reading calibrate too high , a billing adjustment will <br />be made for no rrore than the past six rronth' s actual readings. Whenever <br />it is necessary to shut off or interrupt service for the purpose of <br />making repairs or installations, the Utility shall do so at such tirres <br />as will cause the least arrount of inconvenience to its consl.lll'ers and, <br />unless such repairs are un foreseen and imrediately necessary, :i.t shall <br />give not l ess than five (5) days' notice thereof to its consl.lll'ers for <br />non-energencies. <br />CONNECTION CHARGE /CAPACITY DENAND FEE <br />Connection charge is $500 per Equivale nt Residential Connection <br />(ERC ) for water and/or wastewater service, For the purpose of this rate <br />schedule , an ERC is equal to 25 0 gallons per day of water and /or <br />wastewater consumption to be treated. One condaninium unit is equal to <br />one ERC. <br />The basis for the connection charges and main extension charges as <br />set forth herein has been structured by the Utility with regard to two <br />ma jor but variable factors; first, the present level of construction <br />costs of distribution and treatrrent facilities; and second, their degree <br />of treatrrent sophistication as prescribed by the Department o f <br />Environmental Regulation or body having jurisdiction over the matter. <br />Without County approval, the schedule of connection charges set forth <br />herein may be escalated based upon increases in utility construction <br />costs as evidenced by the quarterly construction index published in <br />Engineering New Record Magazine, "Construction Cost Index, 20 Cities". <br />Utility shall adjust the connection charges set forth herein <br />semi-annually , with the first such adjustrrent to be not earlier than <br />January 1, 1984. Any escalution shall not exceed the percentage <br />difference between said construction cost index for the base period <br />ending September 30, 1981, as cooipared with the period o f cooiparison. <br />Escrow charges and fees as contain in Section YN below s hall be included <br />in the respective conne ction charges listed above and incorporated <br />therein. <br />FRANCHISE FEE <br />The Utility hereby agrees to pay to the County a franchise fee in <br />the arrount of six percent (6%) of the Utility 's annual gross receipts, <br />9