My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/15/2022 (3)
CBCC
>
Meetings
>
2020's
>
2022
>
11/15/2022 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2023 2:44:32 PM
Creation date
4/4/2023 1:03:02 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
11/15/2022
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
443
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
generated by the project's off-site improvements. The Public Works Department has approved the <br />conceptual stormwater management plan and will review the detailed stormwater management plan <br />with the land development permit (LDP) for each respective project phase. <br />10. Traffic Circulation: Access to the proposed development will be provided via a gated full <br />movement driveway connection to 13th Street SW, and second gated full movement driveway <br />connection to 17th Street SW (see attachment 3). The proposed internal traffic circulation plan <br />consists of modified grid roadway network, and one cul-de-sac road at the northeast corner of the <br />project site. Traffic Engineering and Fire Prevention staff have reviewed and approved the internal <br />circulation plan and the driveway connections to 13th Street SW and 17th Street SW. <br />The project's traffic impact study (TIS) has been reviewed and approved by the Traffic Engineering <br />Division. Based on the approved TIS, the following off-site improvements are required: <br />a. Paving of 17th Street SW along the project site's entire frontage <br />b. Southbound right turn lane on 43rd Avenue SW at 13th Street SW <br />c. Northbound left turn lane on 43rd Avenue SW at 13th Street SW <br />d. Westbound left turn lane on 13d' Street SW at project entrance <br />e. Eastbound right turn lane on 17d' Street SW at 43rd Avenue SW <br />The final design of the required road paving and turn lane improvements cited above will be reviewed <br />via the LDP for each respective project phase. <br />During the PD process, the applicant coordinated with the Public Works and agreed to assign some <br />project traffic to a future 17th Street SW bridge crossing the canal located east of 43rd Avenue SW. <br />Therefore, the applicant will need to contribute their fair share of the cost of funding the future I r <br />Street SW bridge crossing. Prior to issuance of an LDP for Phase 1, the applicant must pay their fair <br />share contribution toward the future 17th Street SW bridge crossing. <br />11. Right -of -Way (ROW) Dedications: The project has frontage on three thoroughfare plan roads. <br />These are 13th Street SW, 17th Street SW, and 43rd Avenue SW. <br />a. 13rh Street SW: Currently, all ROW requirements are satisfied for the eastern ±640 feet of the <br />project's 13th Street SW frontage. Through the PD review process, the applicant will dedicate, <br />without compensation, an additional 30' of ROW for the western ±937 feet of the project's 13th <br />Street SW frontage. The applicant must dedicate the required 13a' Street SW ROW dedication, <br />prior to issuance of an LDP for Phase 1. <br />b. 17`h Street SW: Through the PD review process, the applicant will dedicate, without <br />compensation, 70' of ROW for the eastern ±640 feet of the project's 17th Street SW frontage. <br />The applicant will also dedicate, without compensation, an additional 100' of ROW for the <br />western ±665 feet of the project's 17d' Street SW frontage. The applicant must dedicate the <br />required 17d' Street SW ROW dedication, prior to issuance of an LDP for Phase 1. <br />c. 43rd Avenue SW: The Thoroughfare Plan classifies 43rd Avenue SW as a collector roadway <br />requiring 100' of ultimate ROW. Presently, 50' of right-of-way exists for this segment of 43rd <br />Avenue SW. Through the PD review process, the applicant will dedicate, without compensation, <br />50' of ROW for the project's entire 43rd Avenue SW frontage. The applicant must dedicate the <br />required 43rd Avenue SW ROW dedication, prior to issuance of an LDP for Phase 1. <br />C:\Granicus\Legistar5\L5\Temp\3d532b06-11a3-486e-9904-273a038261a0.docx 143 <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.