Laserfiche WebLink
4. Prior to issuance of a certificate of completion for each respective phase, the applicant shall: <br />a. Construct all required off-site improvements. <br />b. Install all required perimeter buffers and project landscape improvements. <br />c. Install all required project streetlighting. <br />5. Internal sidewalks shall be constructed along the frontage of common areas and individual lots in <br />accordance with Section 913.09(5)(b)2. of the County LDRs. <br />ATTACHMENTS <br />1. Draft October 13, 2022 PZC Minutes <br />2. Location Map <br />3. Aerial <br />4. Conceptual/Preliminary PD Plan <br />5. Landscape Plan <br />C:\Cmdnicus\LegisLu5\L5\Temp\3d532b06-11x3-486e-9904-273a038261a0.docx 148 <br />8 <br />