Laserfiche WebLink
• Providing pedestrian connections between uses and projects; <br />• Establishing a grid or modified grid street network; <br />• Siting school and community park areas; <br />• Siting a neighborhood commercial site within the SCI area. <br />To date, two of the seven SCI development projects, have been completed or nearly completed, and <br />there are two other SCI development projects that have active development applications that are <br />currently under review. Although the subject project site was not originally part ofthe SCI, Planning <br />staff is recommending that the project participate in the SCI due to the site's proximity to the overall <br />SCI planning area. The subject project satisfies several of the above -referenced SCI guiding planning <br />principals, and will also provide a financial contribution to the 17th Street SW bridge crossing as <br />outlined in Sections 10 and 16 of this report. <br />18. Concurrency: As required under the County's concurrency regulations, the applicant has applied <br />for and obtained a conditional concurrency certificate for the project. The concurrency certificate <br />was issued based upon a concurrency analysis and a determination that adequate capacity is available <br />to serve this project. The applicant will be required to obtain final concurrency certificates prior to <br />issuance of building permits, in accordance with County concurrency regulations. <br />19. Surrounding Land Use and Zoning: <br />North: 13th Street SW, The Grove Subdivision / RS -3 <br />East: 43rd Avenue SW, Vacant (Future Turtle Creek Preserve PD) / PD <br />South: 17th Street SW, IRFWCD Canal, Tree Farm / A-1 <br />West: Vacant, Single -Family Home/ A-1 <br />All conditions recommended by staff have been accepted by the applicant. <br />RECOMMENDATION <br />Staff recommends that the that the BCC grant conceptual PD plan and special exception approval with <br />the following conditions: <br />1. Prior to issuance of a land development permit for Phase 1, the applicant shall: <br />a. Dedicate all proposed right-of-way dedications. <br />b. Pay their fair share contribution toward the future 17th Street SW bridge crossing. <br />2. Prior to issuance of a land development permit for each project phase, the applicant shall: <br />a. Obtain Public Works approval of the final design of the respective off-site improvements <br />including paving, drainage, turn lanes, and external sidewalks. <br />b. Obtain Planning staff approval of a final landscape and buffer plan. <br />c. Obtain Planning staff approval of the final streetlighting design. <br />3. Prior to or via the final plat process, the applicant shall: <br />a. Construct or bond -out the required landscape buffers. <br />b. Constructor bond -out the required project streetlighting. <br />c. Dedicate a conservation easement in favor of the County over the 1.55 acres of on-site native <br />uplands. <br />C:\Granicus\Legistar5\L5\Temp\3d532b06-11x3-486e-9904-273a038261a0.dmx 147 <br />7 <br />