Change Order Concurrence <br />No. CO -01 <br />DATE OF ISSUANCE: 11/08/2022 EFFECTIVE DATE: 11/08/2022 <br />OWNER: Indian River County <br />CONTRACTOR: TIMOTHY ROSE CONTRACTING, INC. <br />Project: SR 60 and 43`d AVENUE INTERSECTION IMPROVEMENTS <br />OWNER's Project No.: IRC -0853 <br />OWNER's Bid No.: 2019073 <br />FM No.: 431759-2-54-01 <br />You are directed to make the following changes in the Contract Documents: <br />Issue A - Add Time, Time Related Costs and Extra Work Costs for Soil Injection Operation <br />Description: <br />• Extend the Contract Time by 87 calendar days. <br />• Change the Contract Price as follows. <br />Description <br />Unit <br />Qty <br />Unit Price <br />Total <br />Extended MOT <br />Day <br />87 <br />$ <br />396.67 <br />$ <br />34,510.29 <br />Extended Erosion Control and Maintenance <br />Day <br />87 <br />$ <br />38.89 <br />$ <br />3,383.43 <br />Extended Indirect Costs and Expenses <br />Day <br />68 <br />$ <br />1,515.73 <br />$ <br />103,069.64 <br />Remobilizations (TRC) <br />LS <br />1 <br />$ <br />17,607.58 <br />$ <br />17,607.58 <br />Polyurethane Injection (Uretek) <br />LB <br />24,170 <br />$ <br />7.61 <br />$ <br />183,933.70 <br />Pick-up Truck (MOT, Vac, & CCN Crews) <br />Hour <br />81 <br />$ <br />49.64 <br />$ <br />4,020.84 <br />VAC Truck <br />Day <br />9 <br />$ <br />2,508.64 <br />$ <br />22,577.76 <br />CCTV Truck <br />Hour <br />81 <br />$ <br />230.99 <br />$ <br />18,710.19 <br />VAC Truck Operator <br />Hour <br />81 <br />$ <br />74.70 <br />$ <br />6,050.70 <br />Foreman (MOT, CCN, & MOT Crews <br />LS <br />1 <br />$ <br />821.70 <br />$ <br />821.70 <br />Skilled laborer (Vac & CCTV & MOT crews <br />LS <br />1 <br />$ <br />3,017.74 <br />$ <br />3,017.74 <br />CCN Truck Operator <br />Hour <br />81 <br />$ <br />72.03 <br />$ <br />5,834.43 <br />$ 403,538.00 <br />Reason for Change Order (Issue A): <br />The purpose of this Change Order is to increase the Contract Time by 87 days for reasons beyond <br />the Contractor's control, in accordance with General Condition 12.02 of the Contract. This Change <br />Order will also provide compensation to the Contractor for Delay Damages in accordance with <br />General Condition 12.06 of the Contract. Further, this Change Order will account for the costs <br />associated with the actual work effort, all totaling $403,538.00. <br />During construction of the 43rd Ave. & SR60 Intersection Improvements project, an existing <br />drainage trunk line located under EB SR60 was found to have leaks after air voids were discovered <br />between the pipe and existing roadway surface. Further investigations of the leaks and resulting <br />voids were performed by FDOT personnel via GPR scanning below the roadway surface, and <br />Contractor personnel via CCTV recordings inside the existing pipe. As a result of these investigations, <br />the FDOT decided to have the County's contractor perform Polyurethane injection to fill the voids <br />and stabilize the surrounding soils beneath the roadway surface. The work includes MOT setup for <br />each shift, CCN filming each shift, standby vacuum truck and Polyurethane injection (per U <br />proposal dated June 10, 2022) for three specific areas identified in the GPR scanning. All work wi I re <br />