Laserfiche WebLink
IRC -0853 <br />FIN: 431759-2 <br />CHANGE ORDER CO -01 CONCURRENCE <br />PAGE 2 <br />performed in accordance with Developmental Special Provision SECTION 173 SHALLOW <br />SUBSURFACE POLYURETHANE INJECTION (attached as Exhibit D). Since this was a result of existing <br />conditions not noted in the plans, these costs are unforeseen and consequently, the contractor is <br />entitled to additional compensation. <br />When the Contractor found the voids, they stopped work on April 26, 2022, and submitted a notice <br />of delay and intention to claim for additional costs. Subsequently, the FDOT engaged a consultant to <br />perform ground penetrating radar (GPR) to determine the extent of the voids on April 27, 2022, with <br />a report date of May 11, 2022. <br />After much discussion between the FDOT and the County, an agreement was reached to perform <br />urethane soil injection in the void areas found through the GPR process and the Contractor was <br />directed to perform the work. <br />After the agreement was reached, the Contractor engaged a subcontractor for the soil injection. Due <br />to prior commitments, the subcontractor was not able to mobilize to the project until July 18, 2022. <br />After mobilizing to the project, the subcontractor diligently pursued the soil injection and completed <br />the work on July 27, 2022. The Contractor remobilized to the project and began productive work on <br />August 2, 2022. <br />A time impact analysis was performed by the Engineer which determined there was an impact of 87 <br />days to project completion date. In addition to accounting for the actual quantity, labor and <br />equipment required, this Change Order also provides compensation to the Contractor for additional <br />Maintenance of Traffic, Erosion Control & Maintenance and Indirect Costs, Expenses & Profit. The <br />number of days used for the MOT and Erosion Control costs are the total time of time impact. The <br />daily costs for these items was determined by dividing the total of each respective pay item by the <br />Original Contract Time. To determine the Indirect Costs, Expenses & Profit, the FDOT formula (8% of <br />Original Contract Cost/Original Contract Time) was applied to the impact days, less the 9 days on <br />with the Contractor earned mark-up for extra work and less the first 10 compensable days, as <br />allowed by FDOT Specification 4-3.2. <br />Issue B - Material Price Increases to Asphalt Items <br />Description: <br />• Change the Contract Price as follows <br />Pay <br />Original <br />Contract <br />Remaining <br />Total based on <br />Contractor <br />Total Revised <br />hem # <br />Description <br />Unit <br />Unit <br />Qty <br />Original Unit <br />Escalated <br />Cost <br />Total Increase Cost <br />Price <br />Price <br />Price <br />Turnout Construction - <br />0286 -2 <br />AsphalUDriveway Base- <br />$150.00 <br />TN <br />54 <br />$ 8,100.00 <br />$ 243.00 <br />$ 13,122.00 <br />$ 5,022.00 <br />Asphalt <br />0334-1- <br />Superpave Asphaltic <br />13 <br />Concrete, Traffic C (SP <br />$115.00 <br />TN <br />200 <br />$ 23,000.00 <br />$ 176.50 <br />$ 35,300.00 <br />$ 12,300.00 <br />12.5 Overbuild) <br />0334-1- <br />Superpave Asphaltic <br />13A <br />Concrete, Traffic C, PG 76- <br />$122.00 <br />TN <br />1668 <br />$ 203,496.00 <br />$ 205.50 <br />$ 342,774.00 <br />$ 139,278.00 <br />22 (SP 12.51/2"w(poly) <br />0337-7- <br />Asphalt Concrete Friction <br />82 <br />Course, FC -9.5, Traffic C, <br />$126.00 <br />TN <br />2998 <br />$ 377,748.00 <br />$ 227.25 <br />$ 681,295.50 <br />$ 303,547.50 <br />PG 76-22 w/[poly, 1" thick) <br />$ 612,344.00 $1,072,491.50 $ 460,147.50 <br />Reason for Change Order (Issue B): 181 <br />