My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/15/2022 (3)
CBCC
>
Meetings
>
2020's
>
2022
>
11/15/2022 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2023 2:44:32 PM
Creation date
4/4/2023 1:03:02 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
11/15/2022
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
443
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IRC -0853 <br />FIN: 431759-2 <br />CHANGE ORDER CO -01 CONCURRENCE <br />PAGE 3 <br />The purpose of this Change Order is to increase the Contract by $460,147.50 for material price <br />escalations beyond the Contractor's control, in accordance with General Condition 12.01 of the <br />Contract. This Change Order will provide compensation to the Contractor for the increased asphalt <br />prices in contract pay items 0286-2 Turnout Construction-Asphalt/Driveway Base -Asphalt Material; <br />0337-1-13 (Superpave AC Traffic C Overbuild); 0334-1-13A Superpave AC Traffic C, PG 76-22 <br />(w/polymer); and 0337-7-82 AC Friction Course FC -9.5. <br />The Contractor experienced significant delays to the project caused by relocation delays by FPL and <br />added work at the FDOT's request, namely the 54" diameter storm pipe that required urethane <br />injecting the voided areas — see Issue A. These delays along with weather and holiday time <br />extensions have pushed the construction of the asphalt approximately 300 days beyond their <br />originally planned performance period and into a period of unusually high inflated costs. In <br />accordance with General Condition 12.01 of the Contract, this Change Order will account for the <br />increased costs for the remaining asphalt concrete to be placed on the project. <br />Attachments: (List documents supporting change) <br />• Change Order 01 Back-up Documentation (210 pages) <br />FDOT PARTICIPATION REQUESTED: $863,683.50 <br />CHANGE IN CONTRACT PRICE: <br />Description <br />Amount <br />Original Contract Price <br />$13,641,589.27 <br />Net Increase (Decrease) from <br />$0.00 <br />previous Change Orders No. <br />720 <br />N/A to N/A: <br />Contract Price prior to this <br />$13,641,589.27 <br />Change Order: <br />0 <br />Net increase (decrease) of this <br />$863,685.50 <br />Change Order: <br />Contract Price with all <br />$14,505,274.77 <br />approved Change Orders: <br />690 <br />CHANGE IN CONTRACT TIMES <br />Description <br />Time <br />Original Contract Time: <br />(days or dates) <br />Substantial Completion: <br />690 <br />Final Completion: <br />720 <br />Net change from previous Change <br />Orders No. to <br />(days) <br />Substantial Completion: <br />0 <br />Final Completion: <br />0 <br />Contract Time prior to this Change <br />Order: <br />(days or dates) <br />Substantial Completion: <br />690 <br />Final Completion: <br />720 <br />Net increase (decrease) this Change <br />Order: <br />(days or dates) <br />Substantial Completion: <br />87 <br />Final Completion: <br />87 <br />Contract Time with all approved <br />Change Orders: <br />(days or dates) <br />Substantial Completion: <br />777 <br />Final Completion: <br />807 <br />Note the above Changes in Contract Time do not include previous adjustments for Weather and Holidays <br />182 <br />
The URL can be used to link to this page
Your browser does not support the video tag.