My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/15/2022 (3)
CBCC
>
Meetings
>
2020's
>
2022
>
11/15/2022 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2023 2:44:32 PM
Creation date
4/4/2023 1:03:02 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
11/15/2022
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
443
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 7 of 8 <br />Pay <br />Original <br />Contract <br />Remaining <br />Total based on <br />Contractor <br />Total Revised <br />Item # <br />Description <br />Unit <br />Unit <br />Qty <br />Original Unit <br />Escalated <br />Cost <br />Total Increase Cost <br />Price <br />Price <br />Price <br />Turnout Construction - <br />0286 -2 <br />Asphalt/Driveway Base- <br />$150.00 <br />TN <br />54 <br />$ 8,100.00 <br />$ 243.00 <br />$ 13,122.00 <br />$ 5,022.00 <br />Asphalt <br />0334-1- <br />Superpave Asphaltic <br />13 <br />Concrete, Traffic C (SP <br />$115.00 <br />TN <br />200 <br />$ 23,000.00 <br />$ 176.50 <br />$ 35,300.00 <br />$ 12,300.00 <br />12.5 Overbuild <br />0334-1- <br />Superpave Asphaltic <br />13A <br />Concrete, Traffic C, PG 76- <br />$122.00 <br />TN <br />1668 <br />$ 203,496.00 <br />$ 205.50 <br />$ 342,774.00 <br />$ 139,278.00 <br />22 (SP 12.51/2" w/poly) <br />0337-7- <br />Asphalt Concrete Friction <br />82 <br />Course, FC -9.5, Traffic C, <br />$126.00 <br />TN <br />2998 <br />$ 377,748.00 <br />$ 22725 <br />$ 681,295.50 <br />$ 303,547.50 <br />PG 76-22 w/[poly, 1" thick) <br />$ 612,344.00 $1,072,491.50 $ 460,147.50 <br />d. Final Disposition <br />The County and the Contractor have agreed to a final cost of $460,147.50. <br />XI. CRS Coding <br />004 Design Standards, Specification or Policy change after contract letting <br />a. Avoidability Code: <br />b. Cost Recovery Code: <br />c. Claim/Extend Limits Code <br />XII. Premium Cost Analysis <br />0 - Unavoidable: No Remedial Action Required <br />N - No Action Recommended <br />N — Neither <br />There are no premium costs associated with this issue. If the project had been bid during this period <br />of high inflation, the bid price would have been proportionally higher. <br />0 Agree ❑ Disagree <br />Pursue Cost Recovery? ❑ Yes 0 No <br />XIII. Statement of Claim Settlement Costs <br />None <br />VIII. Statutory Reason: <br />This contract modification is being done in compliance with Florida Statute 337.11 (9), <br />to provide for unforeseen work, grade changes, or alterations in plans which could not reasonably <br />have been contemplated or foreseen in the original plans and specifications. <br />190 <br />
The URL can be used to link to this page
Your browser does not support the video tag.