Laserfiche WebLink
To: <br />Indian River County <br />Contact: <br />Address: <br />Vero Beach, FL <br />Phone: <br />200 <br />POLYURETHANE INJECTION <br />Fax: <br />Project Name: <br />POLYURETHANE INJECTION OF TRUNK LINE VOIDS AND DELAY <br />Bid Number: <br />375 <br />CLAIM <br />$7.61 <br />Project Location: <br />400 <br />I Bid Date: <br />Item # Item Description Estimated Quantity <br />Unit Unit Price Total Price <br />100 <br />MOBILIZATION (URETEK) <br />150 <br />REMOBILIZATION (TRC) <br />175 <br />MAINTENANCE OF TRAFFIC <br />200 <br />POLYURETHANE INJECTION <br />300 <br />VAC TRUCK (DURING CONSTRUCTION) <br />350 <br />CCTV TRUCK (DURING CONSTRUCTION) <br />375 <br />CLEAN AND CCN HEAVY SEDIMENT 54" PIPE (POST <br />$7.61 <br />CONSTRUCTION) * <br />400 <br />CLAIM OF TOTAL DAYS DELAYED FROM TRUNK LINE <br />$2,508.64 <br />(FDOT SECTION 4-3.2.1 * <br />405 <br />MAINTENANCE OF TRAFFIC CLAIM DUE TO TRUNK LINE <br />$1,658.97 <br />DELAYS * <br />500 <br />ADDTIONAL BONDING <br />1.00 <br />LS <br />$5,250.00 <br />$5,250.00 <br />1.00 <br />LS <br />$6,256.19 <br />$6,256.19 <br />14.00 <br />DY <br />$1,490.82 <br />$20,871.48 <br />28,000.00 <br />LB <br />$7.61 <br />$213,080.00 <br />14.00 <br />DY <br />$2,508.64 <br />$35,120.96 <br />14.00 <br />DY <br />$1,658.97 <br />$23,225.58 <br />300.00 <br />LF <br />$40.24 <br />$12,072.00 <br />85.00 <br />DY <br />$1,515.73 <br />$128,837.05 <br />85.00 <br />DY <br />$31.73 <br />$2,697.05 <br />1.00 <br />LS <br />$9,122.34 <br />$9,122.34 <br />Total Bid Price: <br />$456,532.65 <br />6/22/2022 5:48:39 PM rfrfZge 1 cf 2 <br />