My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-051
CBCC
>
Official Documents
>
2020's
>
2023
>
2023-051
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2023 9:28:31 AM
Creation date
4/5/2023 9:28:04 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
03/07/2023
Control Number
2023-051
Agenda Item Number
8.O.
Entity Name
Andersen Andre Consulting Engineers, Inc.
Subject
Work Order No. 5 11th Drive & 37th Street Roadway and Intersection Improvements
Improvements Project, Geotechnical Testing Services
Project Number
IRC-2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4XW21 M-1101, <br />ANDERSEN ANDRE CONSULTING ENGINEERS, INC. <br />Geotechnical Engineering <br />Construction Materials Testing <br />Environmental Consulting <br />Indian River County Engineering Department <br />1801 27h Street, Building `A' <br />Vero Beach, Florida 32960 <br />Attention: Mr. Robert S. Skok <br />Infrastructure Project Manager <br />AACE Proposal No. P23-2555 <br />February 3, 2023 <br />Subject: PROPOSAL FOR CONSTRUCTION MATERIALS TESTING AND INSPECTION SERVICES <br />11TH DRIVE AND 37TH STREET ROADWAY AND INTERSECTION IMPROVEMENTS <br />IRC PROTECT No. 2001 <br />INDIAN RIVER COUNTY, FLORIDA <br />Dear Mr. Skok: <br />Andersen Andre Consulting Engineers, Inc. (AACE) is pleased to present this proposal for construction materials testing <br />services during improvements to portions of 11`'' Drive and 37`h Street, as indicated above. The purpose of our services, <br />as discussed further herein, will be to provide materials testing in general accordance with the project plans and technical <br />specifications. Our services also include drilled shaft, signal pole anchor bolt and mast -arm connection bolt inspections <br />as detailed herein. <br />BACKGROUND INFORMATION <br />We understand that the roadway and intersection improvement project includes the following scope elements: <br />• Paving and drainage improvements to approximately 90OLF of 116' Drive, south of 371' Street; <br />• New roadway construction for the 1 Ph Drive extension for approximately 70OLF north of 37`s Street; <br />• Drainage improvements within approximately 50OLF of 37`h Street; <br />• Miscellaneous milling and resurfacing of the intersection of 11`h Drive and 37 h Street; <br />• The construction of mast -arm traffic lighting mounted on four aluminum signal poles which will be supported by <br />drilled shafts; <br />• Incidental sidewalk construction, bus pad construction and driveway restoration. <br />- Balance ofpage intenlionalyleft blank - <br />834 SW Swan Avenue, Port St. Lucie, Florida 34983 Ph: 772-807-9191 Fx: 772-807-9192 www.aaceinc.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.