Laserfiche WebLink
11TH DRIVE AND 37TH STREET ROADWAY AND INTERSECTION IMPROVEMENTS Page -2 <br />IRC PROJECT No. 2001 <br />RACE Proposal No. P23-2555 <br />SCOPE OF SERVICES <br />Based on our review of the Contract Plans (roadway) prepared by MBV Engineering, Inc. (dated October 2022) and the <br />Contract Plans (signalization improvements) prepared by Kimley-Horn (dated April 2022) , we understand that required <br />QC services will include the elements listed below: <br />• Density testing for all embankment, subgrade and base rock used for roadway construction; <br />• Density testing for all drainage improvements (including various conduits and utility deflections/conflicts); <br />• Density testing of sidewalk, driveway and bus pad subgrade; <br />• Concrete compressive strength testing for curbing, driveways, sidewalks, ADA ramps and drilled shafts; <br />• Perform limited asphalt inspection and testing services, both in the field and at the plant; <br />• Drilled shaft inspections and testing for the four mast -arm lighting assemblies and pols. Additionally, we will <br />coordinate the inspection of signal pole anchor bolts and mast -arm connection bolts at each signal location (in <br />general accordance with FDOT Standard Specification 649 (Galvanized Steel Poles, Mast Arms & Monotube <br />Assemblies) and also FDOT's Standard Index 17745 (Mast Arm Assemblies). These services will be performed <br />by our subconsultant, Johnson, Mirmiran and Thompson QMT); <br />• Performing all necessary laboratory testing services to support the above -listed field testing services (e.g., Proctor, <br />LBR, percent -fines, organic content, asphalt gradation/extraction, etc.). <br />Based upon our understanding of the project plans and our prior experience with projects similar to this one, we estimate <br />the cost of the services will be approximately43$ ,851.00. The actual cost of AACE's testing services will be a function of <br />work actually performed in accordance with the attached unit fee schedule (in accordance with the continuing service <br />contract between Indian River County and AACE, Contract #20211207). Contractor efficiency, methodology and changes <br />in testing frequencies may affect the testing cost. We will notify you in advance if it appears that the cost estimate will be <br />exceeded. <br />To authorize us to proceed with this project, please execute and return to us a copy of the attached Project Agreement form <br />or a Purchase Order number. If you have any questions or if we can provide any additional information, please feel free <br />to contact us at your convenience. <br />Best Regards, <br />ANDERSEN ANDRE CONSULTING ENGINEERS, INC. <br />David P. Andre, P.E. Peter G. Andersen, P.E. <br />Principal Engineer Principal Engineer <br />ANDERSEN ANDRE CONSULTING ENGINEERS, INC. <br />WWW.AACEINC.COM <br />