Laserfiche WebLink
11TH DRIVE AND 37TH STREET ROADWAY AND INTERSECTION IMPROVEMENTS <br />IRC PRojECT No. 2001 <br />RACE Proposal No. P23-2555 <br />Page -3- <br />ITEM #1: Field and Lab Testing of Roadway Construction <br />• In -Place Density Testing of Roadway Embankment, Stabilized Subgrade and Base Course; <br />- 85 tests @ $25.00/test (minimum 4 tests per hour, per trip) ......................................... <br />$2,125.00 <br />• In -Place Density Testing of Excavation Backfill for Removal of Old Storm Drainage; <br />$4,250.00 <br />- 50 tests @ $25.00/test (minimum 4 tests per hour, per trip) ......................................... <br />$1,250.00 <br />• In -Place Density Testing of Storm Drainage Trench & Excavation Backfill; <br />- 250 tests @ $25.00/test (minimum 4 tests per hour, per trip) ........................................ <br />$6,250.00 <br />• In -Place Density Testing of Misc. Deflections & Conflicts; <br />$512.00 <br />- 25 tests @ $25.00/test (minimum 4 tests per hour, per trip) ........................................... <br />$625.00 <br />• In -Place Density Testing of Sidewalk, Driveway, Bus Pad Subgrade; <br />- 40 tests @ $25.00/test (minimum 4 tests per hour, per trip) ......................................... <br />$1,000.00 <br />• Moisture/Density Relationship (Proctor) Testing: 6 tests @ $91.00/test.................................. <br />$546.00 <br />• LBR Testing (Stabilized Subgrade, Base Rock); 5 tests @ $315.00/test................................. <br />$1,575.00 <br />• Compressive Strength Testing of Concrete (Sidewalk, Curb, Bus Pad, Driveways, etc.) <br />- 12 sets of concrete cylinders @ $95.00/set. . I .................................................... <br />$1,140.00 <br />• Engineering Technician (man-hours for sample collection, limited standby, etc.) <br />$2,988.00 <br />- 100 hours @ $63.00/hour....................................................................6 <br />3$ 00.00 <br />Item #1 Subtotal: ........................................... <br />$20,811.00 <br />ITEM #2: QC Services During Paving Operations <br />• Asphalt Plant Inspection - Senior Transportation/Roadway Technician; <br />- 2 Days x 10 hours/day @ $85.00/hr. x 1.5 (nighttime testing rate) ................................... $2,550.00 <br />- Asphalt Content and Extraction/Gradation Testing; 2 samples x $210.00/sample ........................ $420.00 <br />• Roadway Coring (2 Coring Events) <br />- Engineering Technician (for Roadway Coring - 2 techs. required for all coring); <br />2 events @ 8 hours/event x @ $63.00/hour x 2 technicians ........................................ $2,016.00 <br />- Coring Mobilization; 2 events x $100.00/mob..................................................... $200.00 <br />- Core Machine Usage; 2 days x $150.00/day....................................................... $300.00 <br />- Generator Usage; 2 days x $50.00/day............................................................ $100.00 <br />- Specific Gravity Testing (Unit Weight) of Cores; 8 cores x $37.00/core................................. $296.00 <br />• Snr. Project Engineer (Pre -Pave Mtg., Test Review, etc.); 10 hours x $128.00/hour.......................$1,280.00 <br />Item #2 Subtotal: ............................................ $7,162.00 <br />ITEM #3: Signalization Drilled Shaft and Anchor/Connection Bolt Inspections <br />• Drilled Shaft Inspection and Testing: <br />- Senior Transportation/Roadway Technician (drilled shaft (4) inspections, includes Pre -Con mtg.); <br />50 hours @ $85.00/hour....................................................................... <br />$4,250.00 <br />• Drilled Shaft Concrete Testing; 4 sets of concrete specimens @ $95.00/ set .................................. <br />$380.00 <br />• Senior Field Technician (CTQP/FDOT Concrete Field Technician, if needed during pours); <br />-24 hours @ $63.00/hour....................................................................... <br />$1,512.00 <br />• Senior Project Engineer; 4 hours @ $128.00/hour..................................................... <br />$512.00 <br />• Anchor/Connection Bolt Inspections: <br />Since the contractor's proposed assembly methodology is currently unknown, we have assumed that <br />separate technician -visits will be required for each of the four anchor assemblies, and also for each <br />mast -arm connection (for a total of 8 technician -visits). Further, we have assumed that a bucket truck <br />will be available for our use. Finally, we have budgeted limited standby time during this effort in the <br />event that MOT requires adjusting, the bucket truck is delayed, etc. However, we have assumed that <br />all inspections will occur during normal working hours/days (M -F, 7am-5pm). <br />Senior Field Technician (Bolted Connections): 6 visits x 6 hours/visit @ $83.00/hour ...................... <br />$2,988.00 <br />• Senior Project Engineer: 4 hours @ $128.00/hour..................................................... <br />$512.00 <br />• Professional/Administrative Man-hours (Engineering Consultations, Reporting, etc.): <br />- Senior Project Engineer; 3 hours @ $128.00/hr....................................................... <br />$384.00 <br />- Technical Secretary; 5 hours @ $50.00/hr............................................................ <br />$250.00 <br />Item #3 Subtotal: .................................. <br />$10,788.00 <br />