Attachment A <br />Financial Project ID (s): 436379-2-54-01 <br />applicable) and the results of the rock coring performed (coring time, recovery and <br />RQD). <br />• Analyze the load test data, pilot holes and any other available soils/rock data as <br />required to establish final drilled shaft tip elevations and minimum rock socket <br />lengths. Submit report(s) recommending production shaft tip elevations, minimum <br />rock socket lengths and any other recommendations that may be required in the <br />project (such as rock socket material definition and impact of permanent or <br />temporary casing on the required minimum socket lengths) to the DGE for <br />approval. <br />• Inspect the bottom of the shafts for cleanliness using manual soundings or shaft <br />inspection device as required in the contract documents. <br />• Complete all necessary drilled shaft inspection forms and keep a log of all <br />inspections made of the shafts. Observe the performance of any load tests and <br />verify that the details are implemented as planned. <br />• Provide completed drilled shaft inspection forms for all production and test shaft <br />installations to the DGE upon completion of the drilled shaft installation. <br />• When conditions occur, which are different from those indicated on the plans, <br />immediately report them to the Geotechnical Engineer of Record and the DGE. <br />Recommend adjustments to the authorized depths as necessary to obtain the shaft <br />capacity to the DGE for approval. <br />• Review the drilled shaft logs and the concrete placement logs to identify possible <br />shaft integrity problems and potential causes. Communicate identified issues to the <br />DGE. <br />• Hire a Specialty Engineer to perform non-destructive integrity testing of drilled <br />shafts as required to estimate shaft uniformity and to detect possible shaft defects. <br />Report results to the DGE. <br />• Evaluate problems encountered during construction, and coordinate with the DGE <br />and the Contractor to resolve such problems, including possible withdrawing <br />Drilled Shaft Installation Plan approval. <br />2) Piles: (N/A) <br />• Process and review the Pile Installation Plan in accordance with CPAM. <br />• Perform preliminary Wave Equation Analyses to assess and provide comments <br />regarding the suitability of hammer driving system(s) included in the Pile <br />Installation Plan. Provide analyses results (estimated blow count ranges for the <br />nominal bearing resistances, installation stresses etc.) to the DGE. <br />• Schedule a pre -pile installation meeting to review and discuss the pile installation <br />procedures. Make sure the Contractor's field superintendent, CEI's pile inspectors, <br />and the DGE are invited. Prepare and distribute meeting minutes to the attendees. <br />• Provide personnel proficient in operation of the PDA or EDC monitoring <br />equipment required for the project, for data collection, interpretation and analysis. <br />Utilize the most current version of equipment and software for dynamic testing and <br />dynamic data analysis. <br />• Perform dynamic testing per the contract documents during initial driving and re - <br />drives. Submit electronic Pile Driving Analyzer (PDA) and Embedded Data <br />Collector (EDC) files upon completion of the test pile installation. <br />• Inspect and record the test pile driving process in accordance with CPAM. <br />Stage I, II or III A- 14 Version 1.0 <br />