My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-056
CBCC
>
Official Documents
>
2020's
>
2023
>
2023-056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2023 12:04:23 PM
Creation date
4/14/2023 11:53:29 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
03/28/2023
Control Number
2023-056
Agenda Item Number
8.S.
Entity Name
Construction Engineering and Inspection (CEI)
Subject
Agreement for professional services for IRC-1505B for 66th Avenue from 69th Street to
CR-510/85th Street. FDOT FM No. 436379-2-54-01, RFQ 202272
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment A <br />Financial Project ID (s): 436379-2-54-01 <br />9.6 Geotechnical Enaineerina: <br />The prime Consultant may engage the services of a geotechnical subconsultant to perform <br />some of the services indicated in this section. However, the prime Consultant will be <br />responsible to Indian River County for the satisfactory performance and timeliness of these <br />services. <br />The prime Consultant will be required to interact with the District Geotechnical Engineer <br />(DGE) office and any geotechnical subconsultant assigned to the project by the DGE office <br />under a District -wide contract. All references to the DGE in the following sections <br />implicitly include the DGE and his/her delegated representative on the project, who may <br />be the DGE office in-house personnel or a subconsultant working for the DGE office. <br />Become familiar with the existing site conditions and the contract documents. Observe <br />and record the progress and quality of foundation work to determine that the foundations <br />are constructed at the correct locations and elevations, identify discrepancies, and direct <br />the Contractor to correct such observed discrepancies. Attend the Preconstruction <br />Conference and/or special geotechnical meeting for the Construction Contract. All services <br />under this section will be performed in accordance to FDOT Specification Section 455. <br />Inspect and verify that the Contractor has performed the foundation work in accordance <br />with applicable FDOT Specification Section 455 and other contract documents. Provide <br />qualified Geotechnical Engineers and CTQP qualified inspectors in Drilled Shaft/Pile <br />Driving/Auger Cast Pile inspection, relevant to the foundation type(s) required in the plans. <br />Schedule meetings and facilitate communications between the Contractor and any <br />Specialty Contractors, the CEI, and the DGE as needed. Observe and verify that all work <br />is performed in accordance with the contract documents. Assure that any specialty work <br />is completed as necessary to accomplish its intent. <br />The following geotechnical engineering services shall be performed: <br />1) Drilled Shafts: <br />• Process and review the Drilled Shaft Installation Plan in accordance with CPAM. <br />• Schedule a pre -drilled shaft installation meeting to review and discuss the drilled <br />shaft installation procedures. Make sure that the Contractor's field superintendent, <br />CEI's drilled shaft inspector(s), and the DGE are invited. Prepare and distribute <br />meeting minutes to the attendees. <br />• Inspect installation of test holes (methods shafts), load test shafts, and production <br />shafts and ensure they are constructed in accordance with the plans, specifications, <br />and special provisions for the Construction Contract. Report to the DGE any <br />problems observed during the installation of the test holes, deviations from the <br />Drilled Shaft Installation Plan or contract documents, and construction quality <br />issues associated with the Contractor's methods. <br />• If there are pilot holes in the project, advise the DGE on the pilot hole schedule. <br />Verify the pilot hole locations. Inspect the performance of the pilot holes and <br />complete the proper FDOT inspection form, describing accurately the soils/rocks <br />encountered and corresponding depths, the results of field testing performed <br />(Standard Penetration Test blow counts, Cone Penetration Tests, or other, if <br />Stage I, II or III A- 13 Version 1.0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.