My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-056
CBCC
>
Official Documents
>
2020's
>
2023
>
2023-056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2023 12:04:23 PM
Creation date
4/14/2023 11:53:29 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
03/28/2023
Control Number
2023-056
Agenda Item Number
8.S.
Entity Name
Construction Engineering and Inspection (CEI)
Subject
Agreement for professional services for IRC-1505B for 66th Avenue from 69th Street to
CR-510/85th Street. FDOT FM No. 436379-2-54-01, RFQ 202272
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment A <br />Financial Project ID (s): 436379-2-54-01 <br />be available to Indian River County, upon request, during the Agreement term. All records <br />shall be kept at the primary job site and shall be subject to audit review. <br />12.0 CERTIFICATION OF FINAL ESTIMATES: <br />12.1 Final Estimate and As -Built Plans Submittal: <br />Prepare documentation and records in compliance with the Agreement, Statewide Quality <br />Control (QC) Plan, or Consultant's approved QC Plan and FDOT's Procedures as <br />required by CPAM and as modified by IRC Procedures. <br />Submit the Final Estimate(s) and one (1) set of final "as -built plans" documenting the <br />Contractor's work in accordance with CPAM & IRC Procedures. <br />Revisions to the Certified Final Estimate will be made at no additional cost to Indian River <br />County. <br />13.0 AGREEMENT MANAGEMENT: <br />13.1 General: <br />(1) With each monthly invoice submittal, the Consultant will provide a Status Report <br />for the Agreement. This report will provide an accounting of the additional <br />Agreement calendar days allowed to date, an estimate of the additional calendar <br />days anticipated to be added to the original schedule time, an estimate of the <br />Agreement completion date, and an estimate of the Consultant funds expiration <br />date per the Agreement schedule for the prime Consultant and for each <br />subconsultant. The Consultant will provide a printout from the Equal Opportunity <br />Reporting System showing the previous month's payments made to <br />subconsultants. Invoices not including this required information may be rejected. <br />(2) When the Consultant identifies a condition that will require an amendment to the <br />Agreement, the Consultant will communicate this need to the Construction Project <br />Manager for acceptance. Upon acceptance, prepare and submit an Amendment <br />Request (AR), and all accompanying documentation to the Construction Project <br />Manager for approval and further processing. The AR is to be submitted at such <br />time to allow Indian River County 12 weeks to process, approve, and execute the <br />AR. The content and format of the AR and accompanying documentation shall be <br />in accordance with the instructions and format to be provided by Indian River <br />County. <br />(3) The Consultant is responsible for performing follow-up activities to determine the <br />status of each Amendment Request submitted to Indian River County. <br />14.0 OTHER SERVICES: <br />Upon written authorization by the Indian River County Public Works Director, or designee, the <br />Consultant will perform additional services in connection with the project not otherwise identified <br />in this Agreement. The following items are not included as part of this Agreement, but may be <br />required by Indian River County to supplement the Consultant services under this Agreement. <br />Stage I, II or III A- 25 Version 1.0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.