Laserfiche WebLink
f <br />* Annual bid contract via P.O. <br />** County Standards requirement (sole source) <br />The construction portion of the project was arrived at through a <br />quote system from local contractors, the results of which are as <br />follows: <br />1. Timothy Rose Contracting 14,030.00 <br />2. A & R Utilities 16,850.00 <br />3. Treasure Coast Contracting 24,830.00 <br />Funding for this work will be from the Renewl and Replacement Fund <br />in Fund 471. <br />RECOMMENDATION <br />The staff of the Department of Utility Services recommends that the <br />Board of County Commissioners approve the above project as <br />presented and award the construction to Timothy Rose Contracting. <br />ON MOTION by Commissioner Eggert, SECONDED by <br />Commissioner Tippin, the Board unanimously approved <br />the project as presented and awarded the <br />construction to Timothy Rose Contracting, in the <br />amount of $14,030.00, as recommended in the <br />memorandum. <br />CONTRACT WILL BE PLACED ON FILE <br />IN THE OFFICE OF THE CLERK TO THE BOARD <br />WHEN RECEIVED <br />NORTH BEACH WASTEWATER REFUNT, FORCE MAIN, WATER <br />MAIN - REJECT BIDS: AU'T'HORIZE REDESIGN BY MASTELLER AND <br />MOLER <br />The Board reviewed a Memorandum of April 11, 1996: <br />DATE: <br />APRIL 11, 1996 <br />TO: <br />JAMES E. CHANDLER <br />COUNTY ADMINISTRATOR <br />FROM: <br />TERRANCE G. P <br />DIRECTOR ILI VICES <br />PREPARED <br />WILLIAM MCCAIN <br />AND STAFFED <br />CAPITAL CTS ENGINEER <br />BY: <br />DE F UTILITY SERVICES <br />SUBJECT: <br />NORTH BEACH WASTEWATER REPUMP, FORCE MAIN, <br />WATER MAIN, BID AND DESIGN IIP -DATE <br />INDIAN RIVER COUNTY PROJECT NO. UW -94 -22 -CS <br />AND UW -95 -22 -DS <br />48 <br />April 23, 1996 <br />