My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-064
CBCC
>
Official Documents
>
2020's
>
2023
>
2023-064
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2023 3:05:24 PM
Creation date
4/27/2023 3:04:05 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
04/04/2023
Control Number
2023-064
Agenda Item Number
12.H.1.
Entity Name
Atkins
Subject
CCNA 2018 Work Order 09 for North County Inline Pump Station Evaluation
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATKINS <br />EXHIBIT A <br />INDIAN RIVER COUNTY UTILITIES DEPARTMENT <br />WORK ORDER No. 9 <br />SCOPE OF SERVICES <br />North County Inline Pump Station Evaluation <br />IRCDUS PID 21-23010 <br />Background <br />Increases in current and anticipated future growth in the north end of the County's service area <br />have resulted in the need to address the replacement of the master lift station for this area, Lift <br />Station 203. In October 2022, Indian River County Department of Utility Services (IRC) requested <br />that Atkins provide technical services to evaluate the option of replacing the existing master <br />pump station, Lift Station 203, with an above -ground booster pump station, Capital Improvement <br />Project Identification Number (PID) 21-23010. Lift Station 203 is located at the decommissioned <br />North Wastewater Treatment Facility (WWTF) and consists of two submersible pumps located in <br />the equalization tank that was part of the abandoned North WWTF. The equalization tank is <br />open to atmosphere, causing major odor issues, and there is concern about the structural <br />integrity of the concrete tank. For these reasons, Lift Station 203 is considered unsuitable for <br />expansion or rehabilitation. Figure 1 shows the existing pump station and tank configuration. <br />Figure 1. Lift Station 203 at the North WWTF <br />IRC would like to replace the deteriorating existing pump station with an in-line above -grade <br />wastewater pump station similar to the configuration of IRC's Lift Station 89. The new pump <br />station will address the increase in pump station capacity as well as the odor issues associated <br />with the current pump station. <br />Lift Station 203 functions as a master pump station, collecting flows from three areas. From the <br />north, there are 59 lift stations that feed into a 24" force main which reduces to a 12" force main <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.