My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-064
CBCC
>
Official Documents
>
2020's
>
2023
>
2023-064
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2023 3:05:24 PM
Creation date
4/27/2023 3:04:05 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
04/04/2023
Control Number
2023-064
Agenda Item Number
12.H.1.
Entity Name
Atkins
Subject
CCNA 2018 Work Order 09 for North County Inline Pump Station Evaluation
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit <br />IRCRC North County Inline Pump Station Evaluation ATKINS <br />Quality Control <br />Atkins will be responsible for the professional quality of all deliverables. This shall include an <br />internal Quality Assurance Plan that, as a minimum, provides review of all deliverables and <br />significant calculations by another qualified professional that was not responsible for preparing <br />the deliverable or calculation. <br />Assumptions <br />The following assumptions have been made in the development of this scope of work, schedule, <br />and fee: <br />General <br />• No survey or geotechnical services are required as part of this conceptual design. <br />• The record drawings, "as-builts," calculations, operational data, and information pipeline, <br />booster station and I&C system are available and will be furnished to Atkins. <br />• The design will be based on the federal, state, and local codes and standards in effect at <br />the start of the project. Any changes in these codes may necessitate a change in scope. <br />• The drawings will follow Atkins CAD standards. <br />• Attendees of the review meetings are designated as decision makers. <br />• Data requests will be addressed within five (5) calendar days. <br />• FDEP permitting is not required for this conceptual design. No permitting support or fees <br />are included in this scope. <br />• No architectural or structural design efforts are required for this evaluation. <br />• No electrical or controls design efforts are required for this evaluation. <br />• No technical memorandum or evaluation summary will be provided beyond a summary <br />of each Workshop. <br />Existing Conditions/ Scope of Work <br />• The existing electrical feed to the pump station will be sufficient for any increase in power <br />required for the new pump station equipment. This will be verified during the next phase <br />of this project to allow adequate time for external coordination, if required. <br />• Landscaping will not be included in this project. <br />• Right-of-way engineering and acquisition services are excluded. <br />• Neighborhood or community meetings are excluded. <br />• Additional meetings not described or accounted for in the Services identified above. <br />• The location of subsurface improvements such as underground utilities are not included <br />in this proposal. <br />Technical <br />• An overall hydraulic profile is not required for this project. <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.