Laserfiche WebLink
ExhibitA <br />IRC North County Inline Pump Station Evaluation <br />ATKINS <br />operation of the pumps and verify pump, motor and drive selections. Preliminary Cost <br />Proposals from vendors will be requested and provided to the County <br />Deliverables: Workshop with the County to review pump station design criteria, <br />including bypass capacity and operations. Workshop summary and vendor cost <br />proposals. <br />Task 05 Pump Station Siting and Preliminary Layout <br />Atkins will determine pump station components, including booster pumps, drive <br />types, piping configurations, backup generator and fuel tank, and control room based <br />on the decisions made at the Pump Operations Workshop. Atkins will review options <br />for utilizing portions of the abandoned North WWTF to house components of the <br />pump station such as the electrical room and control room. A draft layout will be <br />discussed with IRC Staff in a virtual meeting prior to creating a preliminary site plan <br />that includes the proposed yard piping, new pump station and associated components <br />including bypass operations. A conceptual site plan will be submitted to the County <br />via email. <br />Deliverables: Submittal of a draft conceptual site plan, followed by a virtual meeting <br />to discuss County comments. An updated site plan will be submitted to the County via <br />email. <br />Deliverables <br />Task Deliverable <br />1 Invoices, Status Reports, Meeting Agendas and Summaries <br />2 Data Request Memo <br />3 Hydraulic Model Workshop Presentation and Meeting Summary <br />4 Pump Station Operations Workshop Presentation and Meeting Summary <br />5 Draft Preliminary Site Plan and Review Meeting Agenda and Summary <br />Schedule <br />The anticipated schedule shown below is based on the weeks after the formal issuance of the <br />signed Work Order and a Notice to Proceed by the County: <br />Task Duration from NTP <br />Project Kick -Off Meeting and Site Visit 2 weeks <br />Begin Data Collection 2 weeks <br />Hydraulic Modeling Workshop 8 weeks <br />Pump Station Operations Workshop 10 weeks <br />Draft Preliminary Site Plan Virtual Meeting 12 weeks <br />Finalize Site Plan 16 weeks <br />4 <br />