My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-064
CBCC
>
Official Documents
>
2020's
>
2023
>
2023-064
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2023 3:05:24 PM
Creation date
4/27/2023 3:04:05 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
04/04/2023
Control Number
2023-064
Agenda Item Number
12.H.1.
Entity Name
Atkins
Subject
CCNA 2018 Work Order 09 for North County Inline Pump Station Evaluation
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ExhibitA <br />IRC North County Inline Pump Station Evaluation <br />ATKINS <br />operation of the pumps and verify pump, motor and drive selections. Preliminary Cost <br />Proposals from vendors will be requested and provided to the County <br />Deliverables: Workshop with the County to review pump station design criteria, <br />including bypass capacity and operations. Workshop summary and vendor cost <br />proposals. <br />Task 05 Pump Station Siting and Preliminary Layout <br />Atkins will determine pump station components, including booster pumps, drive <br />types, piping configurations, backup generator and fuel tank, and control room based <br />on the decisions made at the Pump Operations Workshop. Atkins will review options <br />for utilizing portions of the abandoned North WWTF to house components of the <br />pump station such as the electrical room and control room. A draft layout will be <br />discussed with IRC Staff in a virtual meeting prior to creating a preliminary site plan <br />that includes the proposed yard piping, new pump station and associated components <br />including bypass operations. A conceptual site plan will be submitted to the County <br />via email. <br />Deliverables: Submittal of a draft conceptual site plan, followed by a virtual meeting <br />to discuss County comments. An updated site plan will be submitted to the County via <br />email. <br />Deliverables <br />Task Deliverable <br />1 Invoices, Status Reports, Meeting Agendas and Summaries <br />2 Data Request Memo <br />3 Hydraulic Model Workshop Presentation and Meeting Summary <br />4 Pump Station Operations Workshop Presentation and Meeting Summary <br />5 Draft Preliminary Site Plan and Review Meeting Agenda and Summary <br />Schedule <br />The anticipated schedule shown below is based on the weeks after the formal issuance of the <br />signed Work Order and a Notice to Proceed by the County: <br />Task Duration from NTP <br />Project Kick -Off Meeting and Site Visit 2 weeks <br />Begin Data Collection 2 weeks <br />Hydraulic Modeling Workshop 8 weeks <br />Pump Station Operations Workshop 10 weeks <br />Draft Preliminary Site Plan Virtual Meeting 12 weeks <br />Finalize Site Plan 16 weeks <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.