Laserfiche WebLink
Exhibit A <br />IRC North County Inline Pump Station Evaluation <br />ATKINS <br />• New infrastructure added since the 2015 Wastewater Hydraulic Model <br />update, including pipe and valves <br />• GIS shapefiles of the collection system <br />• Projected wastewater flows that are anticipated in the LS 203 basin such as <br />planned unit developments, commercial/industrial developments and/or <br />populations projections. <br />• New lift station operations (pumps on/off) <br />• Previous Geotechnical Reports, Condition Assessments, or other studies <br />performed within the abandoned North WWTF site. <br />• Operational SCADA data for all lift stations in Lift Station 203 basin showing <br />pumping start times, durations, and flow rates (15 -minute intervals). <br />Deliverables: Data request memo. <br />Task 03 Hydraulic Evaluation <br />The hydraulic model of the existing collection system will be updated to the latest <br />software version and any new lift stations and piping will be added. Existing flows will <br />be updated in the model based on geocoded water demands, pump station flows, and <br />influent flows at the Central WWTF. Current peaking factors will be determined <br />through evaluation of SCADA data. Future flows through 2045 for Lift Station 203 will <br />be determined by review of anticipated future development and anticipated land use <br />plans. <br />The results of the modeling effort will be summarized and presented in a Workshop <br />with the County for verification of results with actual field operations. Following the <br />meeting, the model will be updated to address County comments. The model will <br />then be utilized to determine the anticipated range of flows and pressures required <br />for the new pump station. System curves will be created for use in pump selection. <br />Along with Workshop meeting notes, tables and figures summarizing the results from <br />the finalized model will be submitted to the County for their records. <br />Deliverables: Workshop with County Staff to discuss and verify the results of the <br />updated model. Workshop summary, including final model tables and figures. <br />Task 04 Equipment Selection and Operations <br />The Atkins Team will utilize the results of the hydraulic model to determine the <br />capacity of the proposed lift station and determine if an emergency wet weather <br />bypass system is required. To meet the anticipated need for bypass during extreme <br />weather, a bypass to the equalization tank has been considered. Pending hydraulic <br />model results, the volume and frequency of bypass operations will be better <br />understood and the potential operations for bypass and recovery can be addressed. <br />Atkins will facilitate a Workshop to discuss options with County Staff and finalize <br />pump station operations. The results of the Workshop will be documented in a <br />meeting summary. Atkins will contact pump vendors to discuss the intended <br />3 <br />