Laserfiche WebLink
Geosynlecl-" <br />consultants <br />Mr. Himanshu Mehta, P.E. <br />Managing Director <br />Solid Waste Disposal District <br />Indian River County <br />1325 74th Avenue SW <br />Vero Beach, Florida 32968 <br />1200 Riverplace Blvd., Suite 710 <br />Jacksonville, Florida 32207 <br />Pt[ 904.8584.1818 <br />www.geosyntec.com <br />28 March 2023 <br />Subject: Proposal to Provide Engineering Services for Construction Contract Procurement <br />Phase 2 — Construction of Cell 3 of Segment 3 Expansion <br />Indian River County Class I Landfill <br />Vero Beach, Indian River County, Florida <br />Dear Mr. Mehta: <br />Geosyntec Consultants (Geosyntec) is pleased to submit this proposal to the Indian River County <br />(IRC) Solid Waste Disposal District (SWDD) for the provision of engineering support services <br />for construction contract procurement related to Phase 2 construction of Cell 3 of Segment 3 <br />Expansion (hereafter referred to as the Project) of the Class I Landfill at the IRC Landfill (IRCL) <br />facility located in Vero Beach, Indian River County, Florida. The proposal presents the scope of <br />work, schedule, and budget estimate for the preparation of construction and contract documents, <br />development of engineer's construction cost estimate, and contractor procurement assistance. <br />The proposal was prepared in response to a 28 March 2023 request from Mr. Himanshu Mehta <br />P.E., Managing Director of SWDD, during a telephone conversation with Dr. Kwasi Badu- <br />Tweneboah, P.E. of Geosyntec. Geosyntec has prepared this proposal as Exhibit A of Work <br />Order No. 1 for the Agreement for Engineering Consulting Services for Landfill Closure, <br />Landfill Gas System Expansion, and Cell Construction dated 4 April 2023 (collectively referred <br />to as the "Agreement"), by and between. INDIAN RIVER COUNTY, a political subdivision of <br />the State of Florida ("COUNTY") and Geosyntec ("CONSULTANT"). <br />The remainder of this proposal presents: (i) project background; (ii) proposed scope of work; <br />(iii) schedule; and (iv) budget estimate. <br />NCP2323092UL23017 Cell 3 Liner Contractor Procurement <br />engineers I scientists i innovators <br />