My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-067
CBCC
>
Official Documents
>
2020's
>
2023
>
2023-067
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2023 3:31:23 PM
Creation date
4/27/2023 3:28:56 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
04/04/2023
Control Number
2023-067
Agenda Item Number
15.B.4.
Entity Name
Geosyntec Consultants, Inc
Subject
Work Order No. 1 for IRC landfill work, Phase 2 Construction of Cell 3, Segment 3 expansion
Document Relationships
2023-066
(Agenda)
Path:
\Official Documents\2020's\2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Himanshu Mehta, P. E. <br />28 March 2023 <br />Page 2 <br />PROJECT BACKGROUND <br />The IRCL facility is located in southern Indian River County, cast of Interstate 95, south of Oslo <br />Road, and west of Rangeline Road in Vero Beach, Florida. The SWDD administers the <br />management and operation of the Class I landfill at the IRCL facility. The Class I Landfill <br />includes the closed Segment 1/Infill/Segment 2 vertical expansion, and Segment 3 lateral <br />expansion (Segment 3). The total footprint area of Segment 3 is 76 acres and consists of eight <br />cells that are being constructed in phases as needed. Segment 3, Cell 1, directly east of and on <br />top of the east slope of Segment 2, was constructed in 2013. Segment 3, Cell 2 was constructed <br />in 2020. Republic Services of Florida LP (Republic), the operator of the Class I Landfill, has <br />estimated that filling of Cell 2 will be nearly completed by the end of Calendar Year (CY) 2023 <br />and has therefore recommended that SWDD considers construction of Cell 3 during CY 2023. <br />In order to expedite Cell 3 construction, SWDD would like to implement it in two phases, as <br />follows: <br />• Phase 1: Site preparation activities consisting primarily of the earthwork for construction of <br />the subgrade for Cell 3; the fill material will be obtained from off-site borrow sources with <br />the actual placement and compaction to be performed by a contractor through the <br />procurement process. <br />• Phase 2: Construction of the Cell 3 liner and leachate control systems to be performed by a <br />contractor selected through a separate procurement process. <br />On 22 November 2023, the SWDD Board authorized Geosyntec to prepare the construction and <br />contract documents, and contractor procurement support, construction management (CM), and <br />construction quality assurance (CQA) services during the placement and compaction of the fill <br />material for the subgrade for Phase 1 of Cell 3 construction. The request for bids from <br />contractors is scheduled to be advertised by the County by 30 March 2023 with a bid opening <br />date of 5 May 2023. <br />This proposal addresses the engineering and support services required to procure a construction <br />contract for Phase 2 of the Project, including preparation of construction documents, engineer's <br />construction cost estimate, and contractor procurement assistance. Geosyntec understands that <br />following the preparation of the construction bid documents and cost estimate, SWDD Staff <br />intends to request SWDD's Board authorization to commence the bidding process for the project. <br />PROPOSED SCOPE OF WORK <br />This project includes professional engineering and support services that will be performed for the <br />procurement of a construction contract for the approximately10.5-acre Cell 3 of Segment 3 of the <br />NCP2323092UL23017 Cell 3 Liner Contractor Procurement <br />- � tiCi('I11 ;yip ( IISl1r rA�tlti;-� <br />
The URL can be used to link to this page
Your browser does not support the video tag.