My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-067
CBCC
>
Official Documents
>
2020's
>
2023
>
2023-067
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2023 3:31:23 PM
Creation date
4/27/2023 3:28:56 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
04/04/2023
Control Number
2023-067
Agenda Item Number
15.B.4.
Entity Name
Geosyntec Consultants, Inc
Subject
Work Order No. 1 for IRC landfill work, Phase 2 Construction of Cell 3, Segment 3 expansion
Document Relationships
2023-066
(Agenda)
Path:
\Official Documents\2020's\2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Himanshu Mehta, P. E. <br />28 March 2023 <br />Page 3 <br />Class I Landfill. The scope of work is based on the requirements of Chapter 62-701, Florida <br />Administrative Code (FAC) and Geosyntec's understanding of the Project based on information <br />provided by the SWDD. <br />Geosyntec will provide all engineering services necessary for the procurement of the <br />construction contract. For budgeting purposes, the scope of work has been divided into four (4) <br />phases, as presented below. <br />• Phase 1 — General Consulting/Meeting Support/Project Management; <br />• Phase 2 — Review of Background Documents; <br />• Phase 3 — Preparation of Construction Documents; and <br />• Phase 4 — Contractor Procurement Support Services. <br />Each of these phases is briefly described below. <br />Phase 1— General Consulting/Meeting Support/Project Management <br />Phase I consists of three components: general consulting, meeting support, and project <br />management. Geosyntec will provide SWDD with consulting services necessary to initiate the <br />project. Geosyntec will prepare presentation graphics, engineering drawings, and other <br />documents required to support the Project's meetings and coordination activities. <br />A kickoff meeting with SWDD is proposed before the start of project activities so that the <br />specific project requirements can be discussed. We suggest that this meeting be attended by <br />Republic so that their input on Cell 3 construction can be provided. If required by SWDD, <br />Geosyntec will prepare for and attend a meeting with the SWDD Board to explain the project <br />scope and budget requirements. In addition, review meetings will be held with SWDD as <br />necessary during the various phases of the project implementation schedule. Following each <br />meeting, Geosyntec will prepare meeting minutes that document decisions reached in the <br />meetings. <br />Project management activities will include: budget and schedule tracking, invoice review, and <br />project comnnlnications, including the preparation of a monthly progress report. The project <br />report will include a description of the activities completed during the month and planned <br />activities for the following month. In addition, the progress report will identify any technical or <br />administrative issues that require SWDD's attention and the current status of the budget and <br />schedule. <br />NCP2323092UL23017 Cell 3 Liner Contractor Procurement <br />I tit will!�t'. I iililrnatO:. <br />