Laserfiche WebLink
AI[ Form 525-010-40A STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION 525 -011 -OA <br />LOCAL AGENCY PROGRAM AGREEMENT PROGRAM MANAGEMENT <br />05/21 <br />EXHIBIT A <br />PROJECT DESCRIPTION AND RESPONSIBILITIES <br />FPN: 446073-1-58-01 <br />This exhibit forms an integral part of the Agreement between the State of Florida, Department of Transportation and <br />Indian River County <br />PROJECT LOCATION: <br />❑ The project is on the National Highway System. <br />❑ The project is on the State Highway System. <br />PROJECT LENGTH AND MILE POST LIMITS: 1.39 Miles <br />PROJECT DESCRIPTION: Project scope consist of the construction of a multi-purpose path along an abandoned railroad <br />right-of-way from Fellsmere to the west side of 1-95 through St Sebastian River Preserve State Park, known as the Trans <br />Florida Central "Rails -to -Trails" Corridor proejct. This project is part of the North County Greenways Plan. Project length is <br />1.39 miles <br />SPECIAL CONSIDERATIONS BY RECIPIENT: <br />The Recipient is required to provide a copy of the design plans for the Department's review and approval to coordinate <br />permitting with the Department, and notify the Department prior to commencement of any Right -of -Way activities. <br />The Recipient shall commence the project's activities subsequent to the execution of this Agreement and shall perform in <br />accordance with the following schedule: <br />a) Study to be completed by N/A <br />b) Design to be completed by N/A <br />c) Right -of -Way requirements identified and provided to the Department by N/A <br />d) Right -of -Way to be certified by 11/18/2022 <br />e) Construction contract to be let by 8/1/2023 <br />f) Construction to be completed by 6/30/2025 <br />If this schedule cannot be met, the Recipient will notify the Department in writing with a revised schedule or the project is <br />subject to the withdrawal of funding. <br />SPECIAL CONSIDERATIONS BY DEPARTMENT: <br />Issuance of the Notice to Proceed (NTP) to the Indian River County is subject to the submittal and approval of the <br />completed: CE 1 Checklist and CE 1 Memo, ROW Form 575-095-05, BID Package and including all attachments <br />technical specifications and final plans. <br />Page 1 of 1 <br />