Laserfiche WebLink
Alt Form 525-010-40B STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION 525-011-08 <br />LOCAL AGENCY PROGRAM AGREEMENT PROGRAM <br />MANAGEMENT <br />8121 <br />Page 1 of 1 <br />EXHIBIT B <br />SCHEDULE OF FINANCIAL ASSISTANCE <br />RECIPIENT NAME & BILLING ADDRESS: FINANCIAL PROJECT NUMBER: <br />Indian River County 446073-1-58-01 <br />1801 27th Street <br />Vero Beach, FL 32960 <br />COST ANALYSIS CERTIFICATION AS REQUIRED BY SECTION 216.3475, FLORIDA STATUTES: <br />I certify that the cost for each line item budget category has been evaluated and determined to be allowable, reasonable, and necessary as required by <br />Section 216.3475, F.S. Documentation is on file evidencing the methodology used and the conclusions reached. <br />Mya Gray <br />District Grant Manager Name <br />Signature Date <br />MAXIMUM PARTICIPATION <br />(1) <br />PHASE OF WORK By Fiscal Year <br />TOTAL <br />PROJECT FUNDS <br />(2) <br />LOCAL FUNDS <br />(3) <br />STATE FUNDS <br />(4) <br />FEDERAL FUNDS <br />Design- Phase 38 <br />Y: (Insert Program Name) <br />$ <br />$ <br />$ <br />$ <br />Y: (Insert Program Name) <br />$ <br />$ <br />$ <br />$ <br />Y: Insert Program Name <br />$ <br />$ <br />$ <br />$ <br />Total Design Cost <br />$ 0.00 <br />$ 0.00 <br />$ 0.00 <br />$ 0.00 <br />Right -of -Way- Phase 48 <br />Y. (Insert Program Name) <br />$ <br />$ <br />$ <br />$ <br />Y: (Insert Program Name) <br />$ <br />$ <br />$ <br />$ <br />Y: Insert Program Name <br />$ <br />$ <br />$ <br />$ <br />Total Right -of -Way Cost <br />$ 0.00 <br />$ 0.00 <br />$ 0.00 <br />$ 0.00 <br />Construction- Phase 58 <br />Y: 2023-2024 (TALL/TALT) <br />$ 368,300.00 <br />$ <br />$ <br />$ 368.300.00 <br />Y: 2024-2025 (TALT/TALU) <br />$ 497,585.00 <br />$ <br />$ <br />$ 497,585.00 <br />Y: 2023-2025 (Local Participation) <br />$ 525,791.00 <br />$ 525,791.00 <br />$ <br />$ <br />Total Construction Cost <br />$ 1,391,676.00 <br />$ 525,791.00 <br />$ 0.00 <br />$ 865,885.00 <br />Construction Engineering and Inspection (CEI)- Phase 68 <br />Y: (Insert Program Name) <br />$ <br />$ <br />$ <br />$ <br />Y: (Insert Program Name) <br />$ <br />$ <br />$ <br />$ <br />Y: Insert Program Name <br />$ <br />$ <br />$ <br />$ <br />Total CEI Cost <br />$ 0.00 <br />$ 0.00 <br />$ 0.00 <br />$ 0.00 <br />Insert Phase <br />Y: (Insert Program Name) <br />$ <br />$ <br />$ <br />$ <br />Y: (Insert Program Name) <br />$ <br />$ <br />$ <br />$ <br />Y: Insert Pro ram Name' <br />$ <br />$ <br />$ <br />$ <br />Total Phase Costs <br />$ 0.00 <br />$ 0.00 <br />$ 0.00 <br />$ 0.00 <br />TOTAL COST OF THE PROJECT <br />$ 1,391,676.00 <br />$ 525,791.00 <br />$ 0.00 <br />$ 865,885.00 <br />COST ANALYSIS CERTIFICATION AS REQUIRED BY SECTION 216.3475, FLORIDA STATUTES: <br />I certify that the cost for each line item budget category has been evaluated and determined to be allowable, reasonable, and necessary as required by <br />Section 216.3475, F.S. Documentation is on file evidencing the methodology used and the conclusions reached. <br />Mya Gray <br />District Grant Manager Name <br />Signature Date <br />