My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-096
CBCC
>
Official Documents
>
2020's
>
2023
>
2023-096
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2023 1:11:54 PM
Creation date
6/1/2023 1:07:54 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
05/16/2023
Control Number
2023-096
Agenda Item Number
8.V.
Entity Name
Kimley-Horn and Associates, Inc.
Subject
Work Order 10 for Professional Services for Oslo Road Water Treatment Plant Sand
Strainer Replacement, RFQ 2019070
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Consultant will observe construction of the proposed sand strainer, piping, valves and <br />appurtenances. Consultant assumes (3) site visits will be required as part of this <br />additional work. Consultant will prepare field reports that summarize the ongoing <br />work and actions to date. <br />Consultant will coordinate with Contractor to perform startup of the proposed sand <br />strainer. Consultant assumes startup will be one (1) day in duration. <br />Consultant will coordinate with TLC to perform pressure testing and bacteriological <br />sampling for the FDEP permit conditions. Consultant will prepare Request for <br />Clearance to place the system into operation and submit to FDEP along with all <br />necessary backup as part of the clearance conditions. <br />Consultant will utilize C&W Engineering for electrical engineering professional <br />services related to the construction of the sand separator replacement. Refer to C&W <br />proposal included within this scope of services. <br />Consultant will utilize the services of Control Systems Design to perform programming <br />associated with the sand strainer replacement. Refer to CSD proposal included within <br />this scope of services. <br />Consultant will utilize Contractor red -lined as-builts to prepare record drawings. <br />Consultant will provide Owner with record drawings in .pdf and Awg format. <br />SCHEDULE <br />Consultant will complete these tasks in a timely manner and mutually agreed upon <br />schedule. <br />FEE SCHEDULE <br />We will provide these services in accordance with our Agreement for Professional <br />Services for Water Plant and Water Resources Engineering Services — RFQ 2019070, <br />dated November 5, 2019, by and between INDIAN RIVER COUNTY, a political <br />subdivision of the State of Florida ("COUNTY") and Kimley-Horn and Associates, <br />Inc., ("Consultant"). <br />The Consultant will provide professional services for Task 1 on a lump sum fee basis as <br />follows: <br />TASK 1 DESIGN $ 27,136 <br />TASK 2 PERMITTING $ 5,642 <br />TASK 3 CONSTRUCTION PHASE SERVICES $ 19,649 <br />TOTAL: $ 52,427 <br />• K:\VvTB—Civil\General\Black\Florida\IRCLT\Oslo WTP Sand Strainer\20230407 - Oslo WTP Sand Strainer Replacement.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.