Laserfiche WebLink
ADDITIONAL SERVICES <br />The following services can be provided as additional services under separate future task <br />order: <br />• Bid phase services <br />• Additional design documents <br />• Front end document preparation <br />• Separate bid package — this proposal assumes the work will be included under <br />TLC's contract <br />• Additional construction phase services <br />K:\WPB—Civil\General\Black\Florida\IRCU\Oslo WTP Sand Strainer\20230407 - Oslo WTP Sand Strainer Replacement.doc <br />