My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5/28/1996
CBCC
>
Meetings
>
1990's
>
1996
>
5/28/1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:05:49 PM
Creation date
6/16/2015 3:46:48 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
05/28/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOOK 98 PAG. 208 <br />ANALYSIS <br />The contractor (J. J. Kirlin) .for the West Regional expansion has <br />now passed his completion date and is into liquidated damages. Due <br />to these. delays in construction, we find that we need to extend our <br />contract inspection services. The monies associated with this <br />additional contract work will be recovered from the contractor at <br />the end of the project as part of a negotiated damages settlement. <br />In the interim, we are requesting an additional $5,000.00 be <br />approved for these additional services. This will bring the total <br />for County inspection services to $25,000.00. As an added note, <br />while the construction is behind schedule, the quality of the <br />project has not been compromised, and staff is pleased with this <br />aspect of the job. Also, preliminary plant start-up is currently <br />estimated to take place in late May. <br />RECOMMENDATION <br />The staff of the Department of Utility Services recommends that the <br />Board of County Commissioners approve the expenditure for additional <br />inspection services as outlined above. <br />ON MOTION by Commissioner Eggert, SECONDED by <br />Commissioner Bird, the Board unanimously approved an <br />additional $5,000 for additional services, bringing <br />the total for County inspection services to $25,000. <br />LAURELWOOD FORCE MAIN AND LIFT STATION UPGRADE - <br />MASTELLER. MOLER, AND REED - TREASURE COAST <br />CONTRACTING <br />The Board reviewed the following memo dated 5/10/96: <br />DATE: <br />MAY 10, 1996 <br />TO: JAMES E. CHANDLER <br />COUNTY ADMINISTRATOR <br />FROM: TERRANCE G. PI <br />DIRECTOR OF LI SERVICES <br />PREPARED ROBERT O. WISEMEN, P.E. <br />AND STAFFED ENVIRONMENTAL ENGINEER q4�10 <br />BY: DEPARTMENT OF UTILITY SERVICES <br />SUBJECT: LAURELWOOD FORCE MAIN AND LIFT STATION UPGRADE <br />INDIAN RIVER COUNTY PROJECT NO. US -96 -03 -CS <br />As set forth in its Master Plan, the County desires to redirect the <br />sewer flow from the Laurelwood WWTP to the South County Regional <br />Wastewater Treatment Plant. The route of the force main, as <br />recommended by the wastewater collection system Master Plan, is <br />shown on the attached plan (Figure 7-24). <br />37 <br />MAY 289 1996 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.