My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-231B
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-231B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2023 1:13:04 PM
Creation date
6/16/2023 1:11:20 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
11/08/2022
Control Number
2022-231B
Agenda Item Number
12.C.2.
Entity Name
Gordian /Johnson-Laux Construction, LLC
Subject
Work Order for the elevation and stabilization of the Jones Pier Bungalow/Historic House &
Jones Pier Conservation Area Public use Improvements
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contractor's Price Proposal - Detail Continues.. <br />Work Order Number: 108749.00 <br />Work Order Title: Indian River County - Jones Pier Residence <br />Section - 08 <br />82 08 52 11 00 0161 SF Removal And Reinstallation Of Wood Windows And Frames $6,511.63 <br />Quantity Unit Price Factor Total <br />Installation 360.00 x 14.62 x 1.2372 6,511.63 <br />removal and salvage of the existing windows and turned over to the owner <br />Subtotal for Section - 08 <br />$6,511.63 <br />Section - 26 <br />83 26 05 <br />29 00 0600 <br />EA 48" x 46", 3" Thick, Polymer Concrete, Electrical Equipment Pad <br />$4,118.09 <br />Quantity Unit Price <br />Factor <br />Total <br />Installation 8.00 x 416.07 x <br />1,2372 <br />4,118.09 <br />equipment pads to disperse the weight of the hydraulic jacks <br />Subtotal for Section - 26 <br />$4,118.09 <br />Section - 31 <br />84 31 05 <br />13 00 0007 <br />CY Common Fill, Native Soil/Dirt <br />$33,504.76 <br />Quantity Unit Price <br />Factor <br />Total <br />Installation 759.00 x 35.68 x <br />1,2372 - <br />33,504.76 <br />fill dirt <br />85 31 05 <br />13 000007 0057 <br />MOD For >96, Deduct <br />-$5,662.38 <br />Quantity Unit Price <br />Factor <br />Total <br />Installation 759.00 x -6.03 x <br />1.2372 - <br />-5,662,38 <br />86 31 05 <br />16 00 0008 <br />CY #57 Stone Aggregate Fill (3/8" To 1") <br />$978.08 <br />Quantity Unit Price <br />Factor <br />Total <br />Installation 16.00 x 49.41 x <br />1,2372 <br />978.08 <br />stone for stabilization underneath hydraulic jacks <br />87 31 05 <br />16 00 0008 0054 <br />MOD For >8 To 16, Add <br />$97.79 <br />Quantity Unit Price <br />Factor <br />Total <br />Installation= <br />16.00 x 4.94 x <br />1.2372 <br />97.79 <br />88 31 11 <br />00 00 0002 <br />ACR Clear And Grub Light Trees Up To 6" Diameter, Cut And Chipincludes <br />grub and <br />$6,148.07 <br />removal of stump <br />Quantity Unit Price <br />Factor <br />Total <br />Installation 100 x 4,969.34 x <br />1,2372 <br />6,148.07 <br />clear and grub around the existing residence <br />89 31 11 <br />00 00 0015 <br />CY Machine Loading Of Cleared And Grubbed Material <br />$152.32 <br />Quantity Unit Price <br />Factor <br />Total <br />Installation 18.00 x 6.84 x <br />1.2372 <br />152.32 <br />loading of cleared material <br />90 31 23 <br />16 36 0009 <br />CY Excavation For Building Foundations And Other Structures By Hand in Soil <br />$1,562.09 <br />Quantity Unit Price <br />Factor <br />Total <br />Installation= <br />20.00 x 63.13 x <br />1,2372 <br />1,562.09 <br />excavating new footings <br />91 31 23 <br />16 36 0009 0013 <br />MOD For Excavation In Heavy/Wet Material (Class C), Add <br />$624.79 <br />Quantity Unit Price <br />Factor <br />Total <br />Installation 20.00 x 25.25 x <br />1.2372 <br />624.79 <br />92 31 23 <br />16 36 0012 <br />CY Relocating On Site Excavated Material From Excavation For Building <br />$76.21 <br />Foundations and Other Structures >100' to 300' <br />Quantity Unit Price <br />Factor <br />Total <br />Installation 20.00 x 3.08 x <br />1.2372 <br />76.21 <br />moving excavated soils from underneath the residence to the skid steer for disposal <br />Contractor's Price Proposal - Detail <br />Page 9 of 12 <br />10/27/2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.