Laserfiche WebLink
Contractor's Price Proposal - Detail Continues.. <br />Work Order Number: 108749.00 <br />Work Order Title: <br />Indian River County - Jones Pier Residence <br />$3,436.87 <br />Section - 31 <br />Excavator, Backhoe, Loader <br />93 31 23 16 36 0012 <br />0018 MOD For Up To 20, Add <br />Total <br />$76.21 <br />Quantity Unit Price <br />Factor <br />Total <br />Installation= <br />20.00 x 3.08 x <br />1.2372 <br />76.21 <br />94 31 23 16 36 0012 <br />CY Relocating On Site Excavated Material From Excavation For Building <br />$2,892.23 <br />$5,549.70 <br />Foundations and Other Structures >100' to 300' <br />by Vibratory Plate, Air Tamper, Etcetera <br />Quantity Unit Price <br />Factor <br />Total <br />Installation 759.00 x 3.08 x <br />1.2372 <br />2,892.23 <br />relocating fill from truck to areas around structure <br />compaction of fill dirt <br />95 31 23 16 36 0018 <br />CY Backfilling Around Building Foundations And Other Structures By Hydraulic <br />$3,436.87 <br />Excavator, Backhoe, Loader <br />Quantity Unit Price Factor <br />Total <br />Installation 759.00 x 3.66 x 1.2372 <br />3,436.87 <br />backfilling around structure <br />96 31 23 16 36 0021 <br />CY Compaction Of Fill Or Subbase For Building Foundations and Other Structures <br />$5,549.70 <br />by Vibratory Plate, Air Tamper, Etcetera <br />Quantity Unit Price Factor <br />Total <br />Installation= <br />759.00 x 5.91 x 1.2372 <br />5,549.70 <br />compaction of fill dirt <br />97 31 23 16 36 0022 <br />CY Compaction Of Fill Or Subbase For Building Foundations and Other Structures <br />$489.44 <br />by Hand <br />Quantity Unit Price Factor <br />Total <br />Installation 20.00 x 19.78 x 1.2372 = <br />489.44 <br />compaction of footings <br />98 31 23 16 36 0024 <br />SY Rough Grading For Building Foundations And Other Structures by Machine <br />$62.87 <br />Quantity Unit Price Factor <br />Total <br />Installation 77.00 x 0.66 x 1.2372 <br />62.87 <br />rough grade around structure <br />99 31 23 16 36 0025 <br />SY Finish Grading For Building Foundations And Other Structures by Machine <br />$101.93 <br />Quantity Unit Price Factor <br />Total <br />Installation 77.00 x 1.07 x 1.2372 <br />101.93 <br />finish grading around structure <br />100 31 23 16 36 0026 <br />SY Finish Grading For Building Foundations And Other Structures by Hand <br />$1,156.04 <br />Quantity Unit Price Factor <br />Total <br />Installation 160.00 x 5.84 x 12372 = <br />1,156.04 <br />finish grading around piers <br />101 31 23 19 00 0004 <br />LF >100' To 250' In Length Well Point System Delivery, Installation And Removal <br />$9,229.51 <br />Quantity Unit Price Factor <br />Total <br />Installation 200.00 x 37.30 x 12372 = <br />9,229.51 <br />dewatering during construction of footers <br />102 31 23 19 00 0011 <br />LFD >100' To 250' In Length Well Point System Rental (LF x Days = Quantity) <br />$16,479.50 <br />Quantity Unit Price Factor <br />Total <br />Installation 12,000.00 x 111 x 12372 = <br />16,479.50 <br />dewatering during construction and placement of footers <br />103 31 23 19 000011 0127 <br />MOD For>1 Month, Deduct <br />-$4,602.38 <br />Quantity Unit Price Factor <br />Total <br />Installation 12,000.00 x -0.31 x 12372 = <br />-4,602.38 <br />104 31 23 19 00 0016 <br />HR Operation Costs <br />$20,741.41 <br />Quantity Unit Price Factor <br />Total <br />Installation 310.00 x 54.08 x 1.2372 <br />20,741.41 <br />dewatering during construction of footers <br />Contractor's Price Proposal - Detail <br />Page 10 of 12 <br />10/27/2022 <br />